7590-01
-4 UNITED STATES NUCLEAR REGULATORY COMMISSION N
DOCKET NO. 50-213 CONNECTICUT YANKEE ATOMIC POWER COMPANY NOTICE OF GRANTING OF RELIEF FROM CERTAIN REf}UIREMENTS OF A$ME CODE SECTION XI INSERVICE'(TESTING)'REQUIREMEWS
~
~
The U. S. Nuclear Regulatory Commission (the Commission) has granted relief from certain requirements of the ASME Code,Section XI, " Rules,for Inservice Inspection of Nuclear Power Plant Components" to the Connecticut Yankee Atomic Power Company. The relief relates to the Inservice Inspection Program for the Haddam Neck Plant (the facility) located in Middlesex County, Connecticut. The ASME Code requirements are incorporated by reference into the Commission's rules.and regulations in 10 CFR Part 50.
The relief is effective as of its date of issuance.
~
.The relief allows postponement of inservice inspection requirements 4
involving disassembly and inspection of six-inch check valves, pursuant to 10 CFR 50.55a(g)(6)(i) of the Commission's regulations.
The request for relief complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), ~ and the Commission's rules and regulations.
The Commission has made appropriate findings as requirec by the Act and the Commission's rules and regulations in 10 CFR-Chapter I, which are set forth in the letter granting relief.
i c
~
8111170504 811103 PDR ADOCK 05000213 G
POR
I The Commission has determined that the granting of relief will not N
result in.any significant environmental impact and that pursuant to 10 CFR 551.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with issuance of this s tion.
For further details with respec't to this action, see (1) the licensee's
~
letter dated' October 7,1981, (2)- the Commission's letter to the licensee
~
dated November 3,1981,which contains the Commission's related evaluation.
These items are available for public-insp'ection at the Commission's Public Document Room,1717 H Street, N. W., Washington, D.- C.
20555 and at the Russell Library,119 Broad Street, Middletown, Connecticut 06457. A copy of item (2) may be obtain2d ~upon request addressed to.the U. S. Nuclear
~
Regulatory Commission, Washington, D. C.
20555, Attention:
- Director, s
Division of Licensing.
Dated at Bethesda, Maryland, this 3rd day of November,1981.
FOR' THE NUCLEAR REGULATORY COMMISSION
.n I'
j
~4, e q q y,y cn~
Thomas V. Wambach, Acting Chief Operating Reactors. Branch #5 Division of Licensing O