ML20032D671
| ML20032D671 | |
| Person / Time | |
|---|---|
| Site: | Marble Hill |
| Issue date: | 11/06/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Shields S PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA |
| Shared Package | |
| ML20032D672 | List: |
| References | |
| NUDOCS 8111170375 | |
| Download: ML20032D671 (2) | |
See also: IR 05000546/1981019
Text
.
i
6198f
.
x
Docket No. 50-546
yg
R.
.
Doclret No. 50-547
D
1 J/.
'
,\\
-
u,
Public Service of Indiana
k
.l 6
C
"8 Ac.s, ,SP*"A .'
ATTN:
Mr. S. W. Shields
S.
" *""4
Senior Vice President
Nuclear Division
S, ,
Post Office Box 190
//,
3 ,
! Id \\
New Washington, IN 47162
N
Gentlemen:
This refers to the routine safety inspection conducted by Mr. F. C. Hawkins
of this office on October 31, 1981, of activities at Marble Hill Nuclear
Generating Station, Units 1 and 2, authorized by NRC Construction Permits
No. CPPR-170 and No. CPPR-171 and to the discussion of our findings with
Messrs. L. Ramsett and G. Warner at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you cr
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven
(7) days from the date of this letter of your intention to file a request
for withholding; and (b) submit within twenty-five (25) days from the date
of this letter a writtea application to this office to withhold such infor-
mation.
Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains a
full statement of the reasons which are the bases for the claim that the
8111170375 811106
F-
f
PDR ADOCK 05C00546
G
_, A
--
.. -
.
-,
.
.
.
4
Public Service of Indiana
-2-
.information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-
!
porated as far as possible. into a separate part of the affidavit.
If we do
not hear from you in tnis regard within the specified periods noted above,
a copy of this letter and the enclosed -inspection report will be placed in
the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
.'
!
.
C. E. Norelius,
irector
,
Division of Engineering and
Technical Inspection
i
Enclosure:
IE Inspection
Reports No. 50-546/81-19
and No. 50-547/81-19
cc w/ enc 1:
W. M. Petro, Executive Director
,
!
Nuclear Project Management
C. Kammerer, CA
J. H. Sniezek, IE
,
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
LeBoeuf, Lamb, Leiby & MacRae
Dave Martin, Office of
Attorney General
John R. Galloway, Staff Director,
Environment, Energy and Natural
Resources Subcommittee
E. P. Martin, Wabash Valley
Power Association
Thomas M. Dattilo, Save the Valley
g
I
t
%(
RI[I
RIII
RII
II
c
hsW/
,
. p.
H kins /jp
Little
Williams
Nor ius
11/5/81
,j/t/'