ML20032D423
| ML20032D423 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 10/21/1981 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Faulkenberry B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, ANPP-19233-GHD, DER-81-17, NUDOCS 8111130769 | |
| Download: ML20032D423 (4) | |
Text
,. t f
Dockot No. 50-528/529/530 50 55(e) Report EM N@ SEUEMN NAW irb T.
3003
,.o,,o x n...
. m ers,x,ani23sa ssa3.
su.
October 21, 1981 ANPP-19233-GHD/BSF.
. ;,V'<@@)# (/.g.
.-[s, U. S. Nuclear Regulatory Comission g
'/
Region V Creekside Oaks Office Park
/2/
k h g7.,\\g \\1P' L i 1450 Maria 1.ane - Suite 210 rE Lt--
Walnut Creek, California 94596-5368 il Attention:
Mr. B. H. Faulkenberry, Chief 5
-c
.e D'
Reactor Construction and Y'(,
Engineering Support Branch l l V,,}
Subject:
Final Report - DER 81-17 A 50.55(e) Reportable Condition Relating to Pipe Supports Fabricated Without Required Weld Joint Preparation File: 81-019-026 D.4,33.2
Reference:
- (A) Telephone Conversation bet 1/een W. Wagner and J. E. Cook on June 18, 1981 (B) ANPP-18405, dated July 15, 1981 (Interim Report)
Dear Sir:
Attached, is our final written report of the reportable deficiency under 10CTR50.55(e), referenced above.
.N
\\
Very truly yours',
--(
i
~
s q~~.
z,*
v
..s.
E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GHD:ske
$7 Attachment cc: See Attached f
} I u e.a a a m.
lM*1%Totiig1
--n
,y w.s...
SI-2m
=
=-
==
=
~ ~~
'-~ -
U.--S. Nuciccr Regulctory Cosmicaisn Act ntion: Mr. B. H. Tsulkenbcrry, Chiaf ANPP-19233-GHD/BSK October 21, 1981 Page 2 cc: Victor Stallo, Jr., Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Washington, D. C.
20555 J. A. Roedel D. B. Fasnacht G. C. Andognini
~ ~ "-'
F. W. Hartley J. M. Allen A. C. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen Ms. Patricia Lee Hourihan 6413 South 26th Street Phoenix, Arizona 85040 8
-4m_...
-~~w
-..we..
t--.
?
-.c--.e--e T-e 4
- r*
7
FINAL REPORT - DER 81-17 REPORTABLE DEyICIENCY 50.55(e)
ARIZONA PUBLIC SERVICE COMPANY (APS)
PVNGS UNITS 1, 2 AND 3 I.
Description of Deficienev A field visual examination by borescope of Pullman supplied welded pipe stanchion on ASME Code III piping and reinforcing pads showed that the con-necting velds lacked full penetration as specified by the Bechtel Engineering drawings. The wold symbol
~~ ~~~~
is denoted as a combined single bevel-groove and a fillet veld.
The cause of this deficiency is attributed to weld symbol identification and interpretation problems that Pullman Power Products has with the full pene-tration weld symbol.
A destructive examination was performed on several of the Pullman supplied asse:ablies by cutting the welded attachments and piping to expose the crcss section of the veld joint. This examination confirmed lack of full penetration. Based on thc.3e findings, it was decided to reevaluate the pipe support design to determine the load carrying capacity of the support.
A tote.1 of 450 pipe support shop drawings for Units 1, 2 and 3 have been identified as being supplied by Pullman for fabrication.
,For purposes of the evaluation, it was assumed that 3
each veld was a fillet only; i.e., no credit was taken for the partial penetration portion veld. The results of the analysis using final design loads resulted in the following:
i a.
280 of these were found to be satisfactory, using only the existing fillet size *as ade-quate to support the design loads.
b.
69 supports were identified as needing increased fillet sizes.
c.
44 of the supports submitted were found to have been modified previously either to delete the l
welded stanchion or to eliminate the support l
entirely.
d.
For 57 of the supports, the design calls for a fillet veld only. There supports are satis-factory without additional evaluat1on or rework.
,4,,y,
,,w,_a,
,,o..
mm= * -
- s Final Report - DER 81-17 Page 2-II.
Analysis of Safety Implications This condition is evaluated as Reportable.since, if left uncorrected, the inadequately velded' supports and related safety-related piping systems could Possibly fail during a safe shutdown earthquake.
s III. _ Corrective Action The following are the corrective actions being taken
~
to resolve this deficiency:
a.
The American Welding Socia':y has concluded that the veld symbol used on the Br.chtel Shop drawings called for a full penetration veld. Pullman has received copies.of this correspondence.
h.
Except for lined pipe, Pullman has been directed to stop welding the dummy _ stub pipe to the run pipe or the reinforciag pad. Bechtel Construction will make these welds in the field.
c.
Applicable drawings will be revised and reissued to show fillet veld only or in-creased fillet veld sizes. Supports requiring increased fillet veld sizes will be repaired following the disposi-tioned NCR-W-C423.
4 Q