ML20032D303
| ML20032D303 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 10/19/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20032D304 | List: |
| References | |
| NUDOCS 8111130621 | |
| Download: ML20032D303 (2) | |
See also: IR 05000327/1981035
Text
ellauJ
%
OCT 191981
Tennessee Valley Authority
'
8 .h
.\\
ATTN:
Mr. H. G. Parri s
r
gN
-
'O
Manager of Power
lgIO8
mD
#
%, IQ*o/A
500A Chestnut Street Tower II
-/
d
'/
Chattanooga, TN 37401
ry
O
Gentlemen:
' /h.
-
%! {T'.i~Y b'7
-
Subject: Report Nos.
-35 g 50-328/81-44
-
This refers to the routine safety inspection cor. ducted by Mr. P. H. Skinner
of this office on September 28 - October 2,1981, of activities authorized by
NRC Operating License No. DPR-77 and Construction Permit No. CPPR-73 for the
Sequoyah facility and to tne discu;sion of our findings held with Mr. J. McGriff,
Assistant Plant Superintendent, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and cbservations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
One new unresolved item resulted frc:n this inspection and is disc';ssed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the reaort contains any information that you believe to be exempt from dis-
closure u<.Jer 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office
by telephone witnin ten days from the date of this letter of your intention to
file a request for withholding; and (b) submit within t.wenty-five days from the
date of this letter a written application to this office to withhold such infor-
mation.
If your receipt of this letter has been delayed such that less than
seven days are mailable for your review, please notify this office promptly so
that a new due cate may be established.
Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the staterent to address with specificity the considerations listed in
10 CFR 2.790(U)(4). TN information sought to be withheld shall be incorporated
as f ar as poss!ble into a separate part of the affidavit. If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Documeat Room.
811113061 Clic19
PDR ADOCK 05000327
O
TEc hA
-
-
v.
c
OCT 191981
Tennessee Valley Authority
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
/s/
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report Nos. 50-327/81-3S
and 50-328/81-44
cc w/ encl:
H. J. Green, Director of Nuclear Power
G. G. Stack, Project Manager
C. C. Mason, Plant
Superintendent
J. F. Cox, Supervisor, Nuclear
Licensing Section
M. J. Burzynski, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
bec w/ encl:
NRC Resident Inspector
Document Management Branch
State of Tennessee
RII /
R
Ry
RII
.
RII
RI
,
PHSkinner:ht
CMU right
CEMu.phy
01 hinksi
R
njak
RClewis
10/ g(/81
10/g/81
10//g/81
10g/81
1047/81
10/ /81