ML20032D023

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-416/81-38 on 810928-1001.No Noncompliance Noted
ML20032D023
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/22/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20032D024 List:
References
NUDOCS 8111130310
Download: ML20032D023 (2)


See also: IR 05000416/1981038

Text

lO

.

,

OCT 221981

m.1 @,

-

\\

0

'2

Mississippi Power and Light Company

[S

/

9

ATTN:

Mr. N. L. Stampley

NOyy O

J

[17 u.s.DyK gISB N y

Vice President of Production

P. O. Box 1640

Jackson, Pts 39205

'

-

Q

&

,f @

Gentlemen:

Subject: Report No. 50-416/81-38

This refers to the routine safety inspection conducted by Mr. G. L. Troup of this

office on September 28 - October 1,1981, of activities authorized by NRC Con-

struction Permit No. CPPR-118 for the Grand Gulf facility and to the discussion

of our findings held with Mr. R. R. Weedon, Chemistry and Radiation Control

Superintendent, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the-

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room:

If the report contains any information that you believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office

by telephone within ten days from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five days from the

date of this letter a written application to this office to withhold such infor-

mation.

If your receipt of this letter has been delayed such that less than

seven days are available for your review, please notify this office promptly so

that a new due date may be established. Consistent with section 2.790(b)(1),

such application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part thereof sought to be withheld,

and a full statement of the reasons on the basis of which it is claimed that the

information should be withheld from public disclosure.

This section further

requires the statement to address with specificity the considerations listed in

10.CFR 2.700(b)(4). The information sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit. If we do not hear from

you in this regard witnin the specified periods noted above, the report will be

placed in the Public Document Room.

8111130310 811022

.

gDRADOCK 05000416

Z Eel

Id

OCT 2 21981

-

,

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

M

R. C. Lewi s , 0.' rector

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report flo. 50-416/81-38

cc w/ encl:

D. C. Gibbs, Vice President

Middle South Energy, Inc.

C. K. McCoy, Plant Manager

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Mississippi

RII

RII

RII

C%d

O

RIJ

R

R

y

ndsyd

b4A

GL ro tht

CHo e

AFGig' son

-0!sbinskt

PTaylor

R Lewis

10/6 /81

10/D /81

-10/ 'St

10/.L//81

10/z.2.21

10/g4 81

M