p JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE-

SUMMARY

OF OPERATIONS OCTOBER, 1981 The unit continued to be shutdown through the month of October for repair of the main generator.

-The following safety-related maintenance was performed in the.

month of October:

1.

Performed miscellaneous maintenance on diesel generators.

'2.

Implemented design change which reset overcurrent trip setpoints on all accumulator discharge. valve feeder breakers.

3.

Performed weld repair of a 2" RHR letdown line located downstream of the 'A' RHR heat exchanger.

4.

Performed vibration analysis on 1C charging pump.

5.

Performed various design changes required by NUREG-0737.

I i

8111130300 011109 l

PDR ADOCK' 05000348 R

pg

r-

's

(

)'

OPERATING DATA REPORT w

DOCKET NO. 50-348-DATE 11/1/81 COMPLETED BY JaLE. Hairston, III TEl.EPHONE. (205) 899-5156 OPERATING STATUS

1. Unit Name: Joset)h M.

Farley - Unit 1 Notes 1)

Cumulative' data

2. Reporting Period: October. 1981 since 12/1/77, date of-
3. Licensed Thermal Power (MWt): 2652
4. Nameplate Rating (Gross MWe):

860 commercial operation.

5. Design Electrical Rating (Net MWe): 829 6.- Maximum Dependable Capacity (Gross MWe):

844.6,

7. Maximum Dependable Capacity (Net MWe):

803rw

8. If Changas Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A 9.' Power Level To Which Restricted. If Any (Net MWe):

N/A

10. Reasons For Restrictions. lf Any:

N/A R'(V 1

This Month Yr to.Date Cair' ulatise n

11. Hours in Reporting Period 745_

7,296 34,344

12. Number Of Hours Reactor Was Critical 0

3.799.5 20,981.8

- 13. Reactor Reserve Shutdown Hours 388 1.045.2 3,492.0

14. Ilours Generator On-Line 0

3,626.3 20,329.7

15. Unit Reserve Shutdown Ilours 0

0

-0

16. Gross Thermal Energy Generated (MWH) 0 8,955,018.7 50.944.910.5
17. Gross Electrical Energy Generata 1(MWH) 0 2.817.544

_16,236,952

18. Net Electrical Energy Generated (MWH)

-5.002 2,624,162 15,231,912

19. Unit Service Factor 00.0 49.7 59.2
20. Unit Availability Factor 00.0 49.7 59.2
21. Unit Capacity Factor IUsing MDC Net)

-00.3 44.8 55.2

22. Unit Capacity Factor IUsing DER Net)

-00.8 13.4 53.5

- 23. Unit Forced Outage Rate 100.0 il.8 10.0

24. Shutdowns Scheduled Oser Next 6 Months (Type, Date.and Duration of Each):

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

February. 1982

26. Units in Test Status (Prior to Commercial Operation):

Forecast

. Achiesed

' INITIA L CRITICA LITY 8/06/77 8/09/77 INITIA L ELECTRICITY 8_/20/77 8/18/77

\\

COMMERCIAL OPERATION 12/01/77 12/01/77-

?'

(4/77) i t

--+ -. - - --

+>,,r---

AVERAGE DAILY UNIT POWER LEVEL e

56-348 DOCKET NO.

D)

UNIT - 1 DATE 11/01/81 COMPLETED BY W. c. Hairston, III TELEPHONE. (?nn 899-5156 MONDI October. 1981 4

DAY AVERAGE DAILY POWER LEVEL '

DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 gy -

2 gg 3 -b-g9 4 20.

I-3 *~

21 6 22.

7 23 '

g 24 -

^

- 9 n-10 -

26,

. r..

jg 7 - '

12 13 '.'. - 23 *,

29 -

0-30 14

~

15 -

33,

16 s

INSTRUCTIONS On this formst. list the average daily unit power levet in MWe. Net for each day in the reporting month. Compute to the nearest who'c megawatt.

(9p) t e

-~

-r

,,.,--rw.m.

ry.

c---


v-w--

=*-s-

- - - ~ - ~ * - - - * -

.)

O, O

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-148 UNIT NAME J.

M.

Fa rl ey - Unit 1 DATE 11/01/81 NEPORT MONTil Octobe r, 1981 COMPLETED BY W.

G.

Hairston, III TELEPHONE (205) 899-5156 "t.

'5 u s E

c re

~.

.3 e 8

g ag Licensee

[v, g%

Cause & Corrective No.

Date g;

Eg

,, g oc Event uT a3 Action to

$5 E

jsg Repor a gu Proent Recurrence I

i ig0 H

5 025 811001 F

745 A

3 N/A EB GENERA

. Continued outage to repair damage to the main generator which occurred September 10, 1981.

i 2

3 4 ~ Exhibit G -Instructions F: Forced Reason:

Method:

S: Scheduled A-Equipment Failure (Explain) l-Man sal for Preparation of Data B. Maintenance of 'Isst 2 Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Osher(Explain) 0161)

E-Operator Training & Ucense Examination F-Administrative 5

G Operatismal Esior (Explain)

%bli 1 - Same Source (9/77)

Il-Other (Explain)

_ _ _ - - _ _ _ _ _