ML20032D010

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Oct 1981
ML20032D010
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/09/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20032D011 List:
References
NUDOCS 8111130297
Download: ML20032D010 (1)


Text

e e

Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291 1

Telephone l'05 250-1000 F. L CLAYTON, JR.

Senior Vice President Alabama POWCf Itv.souttnin ekxArc systern November 9, 1981

/ d _L}J % '

/$

Docket No. 50-348

  1. f atC&g%

NOVl2 bOIA C)

Director, Office of Management Information and Program Control L

  • .,a U. S. Nuclear Regulatory Commission

\\{ -

N u T % (Il Washington, D.C. 20555

't

Dear Sir:

NI RE: Joseph M. Farley Nuclear Plant Unit No. 1 Monthly Operating Data Report Attached are two (2) copies of the October,1981 Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Section 6.9.1.6 of the Appendix A Technical Specifications. As requested by letter from Mr. John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a

" Narrative Sumary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very truly, h

0fny

/

F. L. Clayton, Jr FLCJr/ HOT:cdb Attachments xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Director, RII (1 copy) 9'f ht \\

Ohgo!dffjjg PDR

_