- t JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2' NARRATIVE
SUMMARY
OF OPERATIONS OCTOBER, 1981 There were no unit shutdowns or power reductions during the month of October.
The following safety-related maintenance was performed in the month of October:
- 1. Performed miscellaneous maintenance on diesel generators.
I e
e
.I 1
J 4
^1
..,e.
.A-i OPERATING DATA REPORT -
DOCKET NO.- 50-364 DATE - 11/1/81 COMPLETED BY-W.G. Hairston,L III' TELEPHONE (205) 899-5156 OPERATING STATUS
- 1. Unit Name: Joseph M. Farley - Unit 2 Notes ' 1)
Cumulative.dat'a
- 2. Reporting Period: October 1981 since 7/30/81, date' of.
- 3. Licensed Thermal PoweriMWt): 2652 commercial operation.~
- 4. Nameplate Rating (Gross MWe):
860
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe):
860*
829*-
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
'N/A
- 9. Power Level To Which Restricted,1f Any (Net MWe): N/A
- 10. Reasons For Restrictions,If Any: N/A This Month Yr.-to.Date
' Cur' ulatise n
- 11. Hours In Reporting Period 745 2.257 2.257'
- 12. Number Of Hours Reactor Was Critical 745 2.223 2,223 I
- 13. Reactor Reserse Shutdown Hours 0
34.0 -
~ 34. 0 -
- 14. Hours Generator on-Line 745 2,212.1 2.212.1
- 15. Unit Reserve Shutdown Hours 0-0-
0
- 16. Gross Thermal Energy Generated (MWil) 1.948.774.7
-5.734.857.2 5,734,857.2
- 17. Gross Electrical Energy Generated (MWH) 633.716 1,853,406 1,853,406
- 18. Net Electrical Energy Generated (MWH) 603,364 1;761.614 1.761.614 19.' Unit Service Factor 100.0 98.0 98.0 4
- 20. Unit Availability Factor 100.0 98.0 98.0
- 21. Unit Capacity Factor IUsing MDC Net) 97.7
-94.2 94.2
- 22. Unit Capacity Factor (Using DER Net) 97.7 94.2 94.2
- 23. Unit Forced Outage Rate 00.0 02.0 02.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each1:
None
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
- 26. Units in Test Status IPrior to Commercial Operation):
Fon cast Achiesed INITIAL CRITICALITY 5/06/81 5/08/81
[
INITIA L ELECTRICITY 5/24/81 5/25/81 COMMERCIAL OPER ATION 8/01/81 7/30/81
- The Nameplate - Rating / Design Electrical Rating will be used for the maximum.
Dependable capacity until an accurate value can be determined from operating expe rience.
N/77 )
i
AVERAGE DAILY UNITPOWER LEVEL
[
/
DOCKET NO.
50-364 R.
D TE 1 /01 /81 COMPLETED BY W.G. Hairston, III TF ' PHONE (205) 899-5156 SiONTI{ october. 1981 DAY AVERAGE DAILY POWER LEVEL,
DAY AVERAGE DAILY POWER LEVEL (MWe. Net)
(MWe. Net) 1 819 17 782*
33 811 2
R14 3
792
~
19 825 826 4
All 20
~
5 825 820 21 6
818 22 815-m, 73 815
~
~
7 817 g
826 24 786 V'
9 738 gg-850-10 760 26 813 821 gg
- y 820 824 12
,,3 821' 825 13 3
823 l
14 823 780 30 t
l 15 823 795 33 833 16 INSTRUCUONS On this form:t. list the svenge d:ily unit power level in MWe-Net for e:ch d:y in the reportmg month. Compute to the ne:re:t whole mepwatt.
~
~
~
(9/77) l I
e P
i a
UNIT SilUIDOWNS AND POWER REDUCI10NS DOCKET NO. 50-364 UNIT NA'!E J.
M. Farlev-Unit 2 DATE 11/1/81 REPORT MONTil October, 1981 COMPLETED 8Y W.G. Ilairston, III TELEPlf0NE (205) 899-5156 w.
t ui 5 5
c_
ri No-Date E
'I
'8'SU t~l' "$
b **,
g4 Cause & Corrective
~
.c s oc Event u?
jS" o.
Action to x
2e n
50
$5 5
ji$g Report a Prevent Recurrence d
No Ut it Shutdowns or I ower Rec ucticnts in 0 :tobe r, 1981 1
2 3
4 F: Forced Reason:
Method:
Exhibit G instructions S: Schedt. led A Equipment Failure (Explain) l Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source (9/77)
Il-Other (Explain)
..