ML20032C991
| ML20032C991 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/09/1981 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML20032C992 | List: |
| References | |
| NUDOCS 8111130280 | |
| Download: ML20032C991 (1) | |
Text
_ _ _ _ _ _ _ - _ - _ _ _
Al b.m; Power Comp.ny 600 North 18th Street i
Post Offica Box 2641 Birminghtm, Alib;m2 35291 Telenhone 205 250-1000 d
F. L CLAYToN, JR.
Senior Vice President Ma!)allla power the souttnyn ekxtre system November 9, 1981 Cocket No. 50-364 Director, Office of Management Information and Program Control V. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit No. 2 p nthly Operating Data Report Attached are two (2) copies of the October Monthly Operating Report for Joseph M. Farley Nuclear Plant, Unit 2, as required by Section 6.9.1.10 of the Unit 2 Technical Specifications. As requested by letter from Mr.
John F. Stolz to Mr. Alan R. Barton, dated October 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very truly, F'.9. f-f c k f
S r
- Clayton, r.
FLCJr/ HOT:cdb Attachments xc: Mr. Ted Cintula (1 copy)
Director, IE (10 copies)
Director, RII (1 copy) si i
o!$$$0j4 Oc PDR