-public Service Company Cf Odsude V8 16805 WCR 19 1/2, Platteville, Colorado 80651-9298 November 9, 1981 Fort St. Vrain Unit'No. 1 P-81284 s

c3 terre 4 s

NLi/LJ f(h

'g g

Director IOOI" -

Office-of Inspection and Enforcement U

D.T4 $

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 r,

p Fort St. Vrain Nuclear Generating Station Public Service Company of Colorado Docket No. 50-267-Operating License DPR-34

Dear Sir:

Attached please find the October,1981, Monthly Operating Information for the Fort St. Vrain Nuclear Generating Station.

Very truly yours, WA44 ~[st)

' Don Warembourg Manager, Nuclear Production DW/1sb Attachment cc:

Mr. Karl V. Seyfrit Office of MIPC dg NEA'MEPogigsg, PDR

e PONWLY OPERATING INFORMATION DISTRIBITTION Number of Copies Di re cto r - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

~(Original of P' Letter) -

Office of Inspection and Enforcement U. S. Nuclear Regulatory Comunission -

Washington, D.C.

20555 Karl V. Seyfrit. Director 1

(P Letter)

Region IV -

J Office of Inspection and Enforcement Nuclear Regulatory Coussission 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012 Director - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 (P Letter)

Office of Management Information and Program Control U. S. Nuclear Regulatory Connaission Washington, D.C.

20555 Ted Cintula 1

(P Letter)

U. S. Nuclear Regulatory Commission 12105 National Maryland Bank Building Washington, D.C.

20555 Mr. Richtrd Phelps ---

1 (P Letter)

FSV, CA, Site Representative General Atomic Company P. O. Box 426 Platteville, Colorado 80651 NRC Resident Site Inspector --------------------------- 1 (P Letter)

Senior Vice President, Room 770 1

(P Letter)

Vice President, Electrical Engineering and Planning, 39th Avenue - - - - - - - - - 1 (P Letter)

'?ica President, Production Division, Bellevice - - -

- - - - - - - - - - - - - 1 (P Letter)

Quality Assurance Manager 1

(P Letter)

S i te En ginee ring Coo rdinato r - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

Nuclear P roj ect Manage r, it>n tbello - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

Gary Reeves, Public Relations, Room 950 1

(Original of Memo)

Bill Shinkle, Property Accounting Holly Service Center 1

(Original of Memo)

Supervisor, Licensing and Administrative Services, Nuclea r Project Department, Monthello ' - e -

S e -, e

- - - - - - - - - 1 (P Letter)

Supervisor, Project Engineering, Nuclear Project Department, MontBello - - - - - - 1 (P Letter)

Documents Control Technician, Montbello 2

(2 P Letters)

Correspondence Coordinator, Nuclear Project Department, Montbello 1

(P Letter)

Nuclear P roduc tion Manage r - - - - - - - * - - - - - - - - - - - - - - - '- - 1 (P Letter)

Ope ra t ion s Ma na ge r - '- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

Administrative Services Manager 1

(P Letter)

.--------------,--,,-e PORC Commi t te e - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

FS V NFS C S ec re ta ry - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 (P Letter)

P Files ------------------------------------- 1 (P IAtter)

Record Storage - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _2 (P Letter)

Technical Services Review ---------------------------- 1 (P Intter)

Technical Services Supervisor


1 (P Letter)

Crey Book Notebook - - - - - - - - - - - - -,- - - - - - - - - - - - - - - - - - 1 Moatalf Ope *arions Folder


-------------- 1 Monthly Operating In formation Folde r - - - - - - - - - - - - - - - - - - - - - - - 1 (P 14tterl Monthly Ope rating Informa tion File - - - - - - - - - - - - - - - - - - - - - - - - 0 (Original of Report and 1 Copy of P 14tter)

. Cas Cooted Reactor Associates


1 (P Istter)

-Attention:

Mr. R. A. Evans 3344 North Torrey Pines Court

' Suite 300 LaJolla, California 92037 Electric Power Research institute


1 (P Letter)

Attention:

Mr. Melvin E. Lapides 3412 Hillview Avenue P. O. Box 10412 Palo Alto, California 94303 8111130262 811'109 PDR ADOCK 05000267 R

PDR

a

._....m.

OPERA *ING DATA REPORT

-DOCKET NO.

50-267 DATE 811101 COMPLETED SY-1 M.

McReido TELEPHONE (303) 785-2224 OPERATING STATUS NOTES 1.

Unit Name:

Fort St. Vrain 2.

Reporting Period:

811001 through 811031 3.

Licensed Therms 1 Power Osit):

842 4.

Nameplate Rating (_ Gross We):

342 5.

Design Electrical Rating (Net me):-

330 4

6.

Maximum Dependable Capacity (Gross We): 342 7.

Maximum Dependable Capacity (Net We):

330 8.

If Changes occur in Capacity Ratings (. Items Ntanbar 3 Through 7) Since Last Report, Give Reasons:

None 9.

Power Level To Which Restricted, If Any (Net We):

231 10.

Reasons for Restrictions, If a y NRC restriction of 70% pending resolution of n

temperature fluctuations.

This Manch Year to Date -

Cumlative 745 7,296 20.497'

11. Hours in Reporting Period
12. Number of Hours Reactor Was Critical 739.6 5.234.2 14.369.4 0.0 0.0 0.0 13.

Reactor Reserve Shutdown Hours 14.

acurs Generator on-Line

~ 490.7,_

4.079.5 9.772.8

15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (51) 223,487.6 2,128.025.6 4'.836.118.4
17. Gross Electrical Energy Generated (51) 78.684 783.891 1.655_6R5
18. Net Electrical Energy Generated (WE) 72.051 723.258 1.522.559 65.9 55.9 47.7
19. Unit Service rector J
20. Unit Availability Factor 65.9 55.9 47.7
21. Unit Capacity Factor (Using MDC Net) 29.3 30.0 22.5
22. Unit Capacity Factor (.Using DER Net) 29.3 30.0 22.5
23. Unit Forced Outage Rate 34.1 28.8 14.1
24. Shacdowns Scheduled over Next 6 Months (Type Date, and Duration of Each):

Maintenance /

modification shutdown November 30, 1981, through Januarv, 1982.

25. If Shut Lown at End of Report Period. Estimated Date of Startup:
26. Units In Test Status (7tior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY N/A N/A N/A N/A INITIAL ELECTRICITY N/A N/A mMMERCIAL OPERATION w

-c---

+

,=,,er

-,-r

- c os-e.-

-y

~ - -., -.,

y.,-

g-#


..-.-.--,--w yo

,._-r-+

+---t vW---

-r-w-T-

~*e "Y

ve

-.n.

~- - - - - -

- ~

~ --

r L

)

l 50-267 rL [,

UNIT SHUTDOWNS AND POWER REDUC 11]NS

.%j; DoCEET mo.

Fort St. Vr$1n-UNIT NANg,

Ik1E., 811101

'}

L. M. McBride Cossa m ED sf 5

aEPORT nowru October, 1981 TEt.ErNoNE (303) 785 2224 IE11000 0F SNUTTING DuWN SYSTEM COWONENT No.

DATE TYPE DURATION REASON REACTOR I.ER f CODE ODDE CAUSE AND OptRECTIVE ACTION TO PREVENT RECURRENCE i

B1-021 811013 F

55.1 B

4 N/A HHD HTEXCH Heater #5 tube leakage, taken out of system for repair / replacement.

Reactor remained at <2.0% thermal power.81-022 811019 F

22.0 H

3 N/A IBH XXXXXX 2-loop trouble, reactor scram, turbine trip. PPS protection.

B1-023 811022 F

18.7 H

4 N/A IBH XXXXXX Loop 2 shutdown due to electronic oscillator malfunction. PPS protection.

i B1-024 811625 F

158.5 H

4 81-068/03L-0 CJA PENETR Steam generator B.2.3 penetration

[

i 1eakage of helium.

Is' k

t-a t

Plan to complete fluctuation testing program in November, 1981.

L w.

.L i

AVERAGE DAILY UNIT POWER LEVEL Dockee No.

50-267 Unic Fort St. Vrain Date 811101 Completed By L. M. McBride Telephone (303)~785-2224 Month October. 1981 DAY AVERAGE DAILY POWER' LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 211.4 17 107.1 2

220.7 18 90.0 3

215.9

9 71.7 4

218.8 20 21.9 5

205.6 21 121.8 6

211.3 22 92.8 7

216.3 23 105.1 8

167.0 24 178.5 9

154.9 25 29.6 10 86.1 26 0.0 11 84.9 27 0.0 12 90.5 28 0.0 j

13 81.3 29 0.0 14 0.0 30 0.0 15 0.0 31 0.0 16 70.0

  • Generator on line but no net generation,

~

_. = =

~~

~ - ~

R.UUllI,::NG I.TICR% TION 1.

Name of Fac1110r.

Fort St. Vrain Uni: No. 1 2.

Scheduled date for next refueling shutdown.

Oe:ober 1, 1983 3.

Scheduled date for :sstart following refuelina.

rec.-her i. 1083 6.

Will refueling or resumption of operation thereafter require a tech * =t specification change or other license m d - t?

Yes If answer is yes, what, in teneral, will these ba?

Use of type H-451 eraphite.

If answer is =o, has the reload fuel design and core configura-

1on been reviewed by your Plant Safecy Review Conni::ee :o decer-
nine whether arf unreviewed safety questions are associated vi:h the core reload (2aference 10C7R See:1on 50.59)?

If no such review has taken elace. when is it schedaled?

5.

Scheduled date(s) for submi=ing proposed licensing action and supoortist information.

Not scheduled at this time; to be determined.

6.

Important licensing considera-tions associated wi:h refueling, e.g., new or differanc fuel de-sign or supplier, unreviewed design or performance analysis machods, significant changes in fuel design, new operating pro-cedures.

7.

The number of fuel assemblies 1482 HTGR fuel elements (a) in the core and (b) in the scent fuel storage sool.

50 spent a nel elements s

3.

D e presene licensed spene fuel pool storage capacity and the Capacity is li=1:ed in si:e to about one-size of any increase in 11 caused third of core (approximately 500 HTGR storage capaci:7 that has been elenents). No change is planned.

requested or is planned, is number of fuel assemblies.

d 16 CTFURMC1"f La.aw) 9.

"he projec:acL data of the 1986 under the Drae Far:7 Agrammene (Can-last ref ?=f' = dat can be trac: AT (04-3)-433) becseen DCE, Public d4 -"*% :s de spent fuel Sarrica Campany of Colorado (?Sco), and pool -"7 de pressac General Acomic Company.*

licensed czoac1:v.

i

    • he 1986 data 1.s based on -de undersaad' g -Jac spene fuel discharged, during

.the tars of the ""hree ?arry Agreement vd11 he shipped :s cha Idaho Na'cional Inf-Mng Laboraccry for ses:ags by IlCE at -Ja Idaho Chs"1 ?r: cessing Plant (IC??). D e storage capac1:7 has evidently been sized c accomodaca fual which is expec:ad to be d4~h=W during the eight year period c:nrerad by the Drae ?sz:7 Ag=amment.

l I

i

--e--+=ww,--wmoe'

-psi 9-vs ee--yemer w e-wmm r-sp+.wwe,c-ae--e-e--y--&%-w.*,,w~m,ewg--y.--,er, ww + w yw-w.-,--3-ge,swwwn-_--p-eyywww g + w e g-wg-g-p w.--

q w-+-

e-.m.wy6e. e-mwy-m-+M-r