Forwards IE Insp Repts 50-266/81-17 & 50-301/81-19 During Sept 1981.No Noncompliance Noted
ML20032C354
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/27/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20032C355 List:
References
NUDOCS 8111090706
Download: ML20032C354 (2)


See also: IR 05000266/1981017

Text

r

--

a

s.

r.

-

cp

.

f

,

,

g-

h"

J7J

p

p

<

,

.s. . )

,

_;

OCT 2 71981

"

'

'

-

,

.

,

-

4

'

g M l * v,h

Docket No; 50-266

4 f ill

e)

Docket No. 50-301

~

'

U

N

Wisconsin Electric Power Company

-O

ATTN:

Mr. Sol Burstein

i

NOVO 61981

~

.

Executive Vice President

h . - u.s, euasa ucuma

'

Power Plants

~

N# -

I,

'

231 West Michigan

Milwaukee, WI 53201

~

s

/

/-

-

Gentlemen:

,

.

This refers to the routine safety inspection conducted by Messrs.

W. G. Guldemond ind R. L. Hague of this office 'on September 1-30, 1981,

of activities at Point Beach Nuclear Power Plant,. Units 1 and 2, author-

ized by NRC Operating Licenses No. DPR-24 and DPR-27 and to the discussion

of our iindings with Mr. G. A, Reed, at the conclusion of the inspection.

.t

The enciased copy of bur, inspection report identifies areas examined during

.

the inspection. Within'these areas, the inspection consisted of a selective-

'

examination of procedures acd representative records, observations, and

~

interviews with personnel.

-

,

j

No items of noncompliance with NRC requirements were identified during this

meeting.

,

,~

In accordance with 10,CFR 2.790 of the Conaission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

[-

.Public Document Room.

If this report contains any information that you or

i

your contractors believe to be exempt frora disclosure under 10 CI t 9.5(a)(4),

i

a-

it is netessary that you (a) notify this office by telephone within seven (7)

'

days fro.n the date of this letter of yo'.ir intention to file a request for

!

withholding; and (b) submit within twenty-five (25) days from the date of

'

this letter a written application to this office to withhold such infor-

%

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

"

'

'

.

,,

,

'

-

s

%

$

!

-

-

, , '

i

8111090706 811027

PDR ADOCK 05000266

G

PDR

S'

L-

-

-

e

.

Wisconsin Electric Power

-2-

g <2 7 1981

Company

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons which are the bases for the claim that the

Laformation should be w'thheld from public disclosure. This section further

requirea 'he statement to addr-ss with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the afficavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

-

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

A J

' cf( g .

swt

'

R. L. Spess rd, Director

Division of Resident and

Project Inspection

Enclosure:

IE Inspection

Leports No. 50-266/81-17

and No. 50-301/81-19

,

cc w/ encl:

G. A. Reed, Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Inspector

Peter Anderson, Wisconsin's.

Environmental Decade

Stanley York, Chairman

Public Service Commission

.

RI

-

gf

_

-

ptII

RIII

RI I

RIII

.. j

,

v

i

idemand7,)pb e

,'Ndn

/ n pr

'

',

'

u

Streeteq

Sppscrd

in

Hawkins

10/19/81

g

.

f

'%

-