ML20032C193

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-282/81-18 & 50-306/81-20 on 810901-30.No Noncompliance Noted
ML20032C193
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 10/27/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Gilberts D
NORTHERN STATES POWER CO.
Shared Package
ML20032C194 List:
References
NUDOCS 8111090419
Download: ML20032C193 (2)


See also: IR 05000282/1981018

Text

e

.

,x

%

DCT 2 71981

-

'

,

lbjD

Docket No. 50-282

-Docket No. 50-306

'

h$

Northern States Power Company

,

ATTN: Mr. Dennis E. Gilberts

D u//0VO 6 IOOlb

'

I

Senior Vice-President

'

Power Supply

. MgNum

.

,

q,3

  1. U

414 Nicollet Mall

Minneapolis, MN 55401

'

'-

'

'

Gentlemen:

"

This refers to the routine safety inspection conducted by Messrs.

'

C. D. Feierabend and B. L. Burgess of this office on September 1-30, 1981,

of activities at the Prairie Island Nuclear Gen <-ating Plant, Units 1.and 2,

authorized by NRC Operating Licenses No. DPR-42 and No. DPR-60 and to the

discussion of our findings with Mr. Tierney and other members of his staff

at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspecticn. Within these areas, the inspection consisted of a selective-

examination of procedures and representative records, : observations, 'and

interviews with personnel.

-

.

No items of noncompliance with NRC requirements'were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclos'ed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify thiscoffice by telephone within seven (7)

days-from the date of this letter of your intention to file a request for

l

withholding; and (b) submit within twenty-five (25) dayq from the date of

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons which are the bases for the claim that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

h

O

R

O-

\\-

Ifo/ 9'il

_ _ _ _ __ _ _ _ _ ___

- _ _ - -

-_-

- _ .

.-

.

.

.

Northern States Power Company

-2-

OCT 2 7.121

in 10 CFR 2.790(b)(4). 'The information sought'to be withheld shall be:

-

-incorporated as far as possible into a separate part of the affidavit.

If-

we do not hear from you in this regard within the specified periods noted

above, a copy of~ this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,-

nMd

R. L. Spessard, Director

Division of Resident and

'

Project Inspection

. Enclosure:

IE Inspection

Reports No. 50-282/81-18

and No. 50-306/81-20

cc w/ encl:

-F.

P. Tierney, Jr., Plant Manager.

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John W. Ferman, Ph.D.,

s

Nuclear Engineer, MPCA

,

'

i

.

RIII

RIII

RII

RI I

RIII[

~ Mil--Y

<

V

Bu"r;zjp/np- qff[3 bend

Lity I

tgeter

Spes sard

3 * '~

'

.c

<

gess

Fei

.

l

10/22/81

1

10 d

(O M

/'

-

,

u.

.-

. . .. .

.

.-

. .

.

-_

.