ML20032C190

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1981
ML20032C190
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/02/1981
From: Peterson D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
Shared Package
ML20032C189 List:
References
NUDOCS 8111090413
Download: ML20032C190 (4)


Text

.

OPERATING DATA REPORT

~

DOCKET NO.

DATE 11 2 81 C051PLETED BY pa+nnnk-8913 (616)-76 IELEPHONE '

OFFRATING STATUS Notes

1. Unit Name:

Palisades 2.. Reporting Period:

811001-811031

3. Licensed Thennal Power (51Wt):

9590

4. Nameplate Rating (Gross 51We):

811.7

5. Design Electrical Rating (Net 51We):

805

  • bI5
6. 51asimum Dependable Capacity (Gross 51We):
  • 635
7. 51asimum Dependable Capacity (Net 51We):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Gise Reasons:
9. Power Level To which Restricted.lf Any (Net 51We):
10. Reasons For Restrictions,If Any:

This hf onth Yr.-to Date Cumulative.

Thh 7295 86.510 I1. Hours in Reporting Peric:1

12. Number Of Hours Reactor Was Critical 0

sos 6.o h8.579.3

13. Reactor Reserve Shutdown Hours 14.- Hours Generator On.Line 0

5010.7 h6.20h.2

15. Unit Reserve Shutdown Hours.

0 11,702,424 91,h06,160

16. Gross Thermal Energy Generated (51WH)
17. Gross Electrical Energy Generated (51WH) 0 9.669_shn 28.227.950-
18. Net Electrical Energy Generated (51WH) 0 3.h62.629 26,512.933
19. Unit Service Factor 0

68.7 53.4 0

68.7 mh

20. Unit Asailability Factor 0

74.7

[U a

21. Unit Capacity Factor (Using 51DC Net) 0 W.0 qg,{

c 22.' Unit Capacity Factor (Using DER Net) f 0

1h 1 33.1

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Nest 6 Slonths (Type.Date.and Duration of Each):

e 4

P 8

25.' If Shut Down At End Of Report Period. Estimated Date of Startup:

11-29,

26. Units in Test Status (Prior o Commercial Operation):

Forecast Achiesed INITI A L CRITICALITY l.

INITIAL ELECTRICITY CON 151ERCI AL OPERATION

^

/

higCK05000255-

~

,sure 413 811103 (4/77)

R PDR L m..m m

.--w

m AVERAGE DAILY UNITPOWER LEVEL -

DOCKET NO.

50-255 UNIT -

h14cnann DATE 11-2-81 COMPLETED BY

'DPeterson' TELEPHONE (616) 764-8913 MONTH.

October 1981 ~

DAY AVERAGE DAILY POWER LEVEL

~ DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net)

~

1 0

17 0

2 0

0 18 0

0 3

19 0

g 20 0

5 0

0 21 6

0 0

22

~0 7

0 0

23 S

0 24 9

0 0

25 0

10 26 0

0 11 0

27 12 0

0 28 0

13 29 0

0 14 0

30 15 0

0 31 0

is INSTRUCTIONS -

On this format.lin the ascrage daily unit power levelin MWe Set for each day in the reporting month. Compute to the nearest whole meg 2 wart.

(9/77)

J

a s-UNITSliUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-255

. UNIT NAME Palisar'.es DATE ll o Al REPORT MONTil October 1981 COMPLETED llY DVanDenBerg TELEPilONE -(616) 764-8913 w.

E E

.5 ?

3

$ lid Licensee Eg

[c",,

Cause & Corrective No.

Date g

3=

$j

.g g &

Event g7

!'3 o.

Action to

$2 35e Report #

mO Prevent Recurrence 2

o e

6 7

81 08 29 s

Thh c

1 L

i 2

3 4

F: Forced Reason:

Method:

Exhibit G. Instructions S: Scheduled A Eiguipment Failure (Explain)

I Manual for Preparation of Data ll-Maintenance of Test 2 Manual Scram.

Enity Sheets for 1.ieensee C-Refueling 3-Automa:!c Scram.

Event Repori (LER) File (NUREG.

D Regulatory Restriction.

4-Ot her (Exp5in) 0161).

li-Operator Training & License Examination F-Administrative 5

G-Operational Error (lixplain)

Exhibit I - Same Source (9/77) ll-Other (Explain)

~

o M Y OF OPERATING EXPERIENCE FOR OCTOBER 1981 The plant commenced with its refueling outage August 29, and is expected to return to service al. the end of November.

i I

t b

d

}

e