Forwards List of NUREG-0737 Items Which Will Be Deferred During Unit 3 Cycle 4 Outage.Util Is Not Able to Meet 8-h Emergency Lighting Requirement of 10CFR50,App R.Basis for Deferrals Described in
ML20032C176
Person / Time
Site: Browns Ferry  
Issue date: 11/03/1981
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.3, TASK-2.E.4.1, TASK-2.F.1, TASK-2.K.3.13, TASK-TM NUDOCS 8111090344
Download: ML20032C176 (2)


Text

TENNESSEE VALLEY AUTHORITY

+

j CH ATTANOOGA, TENNESSEC 374o1 400 Chestnut Street Tower II

. M 1h'N

. November 3, 1981 g{-

fl.i (f NOVO 6198>

9

.C

-Mr. Harold R. Denton, Director

,,,, m a m C Office of Nuclear Reactor Regulation C,

    • WU588 U.S. Nuclear Regulatory Commission g/f Washington, DC 20555 4

Dear Mr. Denton:

In the Matter of the

)

Docket Nos. 50-259 Tennessee Valley Authority

)

50-260 50-296 In my October 28, 1981 letter to you, we requested your concurrence with our proposal to integrate future NRC requirements into our schedule and to defer completion of certain requirements. The purpose of this letter is to inform you of the specific items which are intended to be deferred during the unit 3 cycle 4 outage (which began October 30, 1981) and to formally notify you that we will not be able to meet the eight-hour emergency lighting requirements of 10 CFR Part 50, Appendix R.

The enclosure lists the items that we intend to defer during the ongoing unit 3 outage. The basis for these deferrals and the new schedules for completion are described in detail in my October 28 letter to you.,

Our inability to meet the November-18, 1981 deadline for installation of the eight-hour emergency lights (as required by 10 CFR Part 50, Appendix R)-

was discussed in our September 30, 1981 meeting with your staff.

Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Mandger Nuclear Regulation and Safety Subscribed a d sworn t befor me this b __ day of.

1981.

Notary Public My Commission Expires b

Enclosure cc:

Mr. James P. O'Reilly, Director (Enclos;re)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region II - Suite 3100 l

A l

101 Marietta Street OC i

Atlanta, Georgia 30303 L

\\

8111090344 811103 PDR ADOCK 05000259 i

m-

,. mqual Opocetunity Emouyer

.. ~

s PROPOSED DEFERRAL MODIFICATION LIST NUREG-0737 REQUIREMENTS DESCRIPTION II.B.3 Postaccident Sampling II.E.4.1 Dedicated H Penetrations 2

II.F.1.1 Accident Monitor Noble Gas II.F.1.2 Instrumentaticn Iodine Monitor I I. F.1. 3 Containment Hi-Range Monitor II.F.1.9 Containment Pressure II.F.1.5

's Containment Water Level II.K.3.13 RCIC Auto Restart MISCELLANEOUS COMMITMENTS k

Modify Reactor Protection System Eight-Hour Emergency Lighting - Appendix R e

u p

$