k*
,
4
'
.
c,
1961
,.g f
3
/
h
/g
Docket No. 50-266
/[
'
Docket No. 50-301
k
i h ,~l
vo -
-
[' #'%i ktouIA @j[
Wisconsin Electric Power Company
ATTN:
Mr. Sol Burstein
N
Executive Vice President
,
Power Plants
N
i
231 West Michigan
/t
fh
i/
Milwaukee, WI 53201
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
D. L. Robinson and I. N. Jackiw of this office on September _29 and
October 12, 1981, of activities at the Point Beach Nuclear Power Plant,
Units 1 and 2, authorized by NRC Operating Licenses No. DPR-24 and No.
DPR-27 and to the discussion of our findings with Mr. G. A. Reed and
others of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room. If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor-
mation. Section 2.790(b)(1) requires that any such noplication must be
accompanied by an affidavit executed by the owner of the information which
8111060690 811103
{DRADOCK05000
T 8h
4
.
M
3 labi
Wisconsin Electric Power
-2-
Company
identifies the document or part sought to be withheld, and which contains
a full statement of the reasons which are the bases for the claim that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
we do not hear from you in this regard within the specified periods noted
above, a copy of this letter and the enclosed inspection report will be
placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
l' Original Signed by C.E. Morellus"
C. E. Norelius, Director
Division of Engineering and
Technical Inspection
Enclosure:
IE Inspection
Report No. 50-266/81-18
and
No. 50-301/81-20
cc w/ enc 1:
G. A. Reed, Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Inspector
Peter Anderson, Wisconsin's
Environmental Decade
Stanley York, Chairman
Public Service Commission
RIII
RIII
RIII
RIII
RIIg'
?
G
"
CTS yw
% rot son /jp
Kbnklin
f liams
M i is
, ,(g
,iblS'
/
10/21/81
U /2/,: ..
\\i,}
_