Forwards IE Insp Repts 50-266/81-18 & 50-301/81-20 on 810929 & 1012.No Noncompliance Noted
ML20032C093
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/03/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Burstein S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20032C094 List:
References
NUDOCS 8111060690
Download: ML20032C093 (2)


See also: IR 05000266/1981018

Text

k*

,

4

'

.

c,

1961

,.g f

3

/

h

/g

Docket No. 50-266

/[

'

Docket No. 50-301

k

i h ,~l

vo -

-

[' #'%i ktouIA @j[

Wisconsin Electric Power Company

ATTN:

Mr. Sol Burstein

N

Executive Vice President

,

Power Plants

N

i

231 West Michigan

/t

fh

i/

Milwaukee, WI 53201

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

D. L. Robinson and I. N. Jackiw of this office on September _29 and

October 12, 1981, of activities at the Point Beach Nuclear Power Plant,

Units 1 and 2, authorized by NRC Operating Licenses No. DPR-24 and No.

DPR-27 and to the discussion of our findings with Mr. G. A. Reed and

others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room. If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such noplication must be

accompanied by an affidavit executed by the owner of the information which

8111060690 811103

{DRADOCK05000

T 8h

4

.

M

3 labi

Wisconsin Electric Power

-2-

Company

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons which are the bases for the claim that the

information should be withheld from public disclosure.

This section further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

l' Original Signed by C.E. Morellus"

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

Enclosure:

IE Inspection

Report No. 50-266/81-18

and

No. 50-301/81-20

cc w/ enc 1:

G. A. Reed, Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Inspector

Peter Anderson, Wisconsin's

Environmental Decade

Stanley York, Chairman

Public Service Commission

RIII

RIII

RIII

RIII

RIIg'

?

G

"

CTS yw

% rot son /jp

Kbnklin

f liams

M i is

, ,(g

,iblS'

/

10/21/81

U /2/,: ..

\\i,}

_