ML20032C008
| ML20032C008 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 10/29/1981 |
| From: | James Y, Kolotkin R, Luberman S, Prigoff A, Small M, Steven, Wasserman E AFFILIATION NOT ASSIGNED |
| To: | Palladino N NRC COMMISSION (OCM) |
| References | |
| NUDOCS 8111060606 | |
| Download: ML20032C008 (7) | |
Text
D
/
1 DC Mr Nunzio Palladino us RC 110V 0' 61981* 'g
.irman T,m
- 46 129 P4 Washingt
.C a
s a
OFFICE OF SECRETM 1
Dear Mr. Palladino:
00CKEi g ERVICt THE DIABLO CANYON PLANT.MUST NEVER OPEN!
This reactor is sited only 3 miles from an earthquake fault, discovered after construction began.
Why did not the NRC stop construction immediately ?
Now a major flaw Sivolving the stress analysis of pipe supports has been found. This flaw may affect the ability to withstand earth-quakes -- which occur periodically along the Pacific coast.
The PG & E Company, the builder has announced an indefinite delay.
HOW COULD IT BE THAT THIS PLANT WAS ISSUED A LICENSE 7 V' HAT KIND OF INSPECTION DOES THE NRC DO ?
Your,redibility is zero. You didn't inspect a major diagram. You weren't even able to find a major design flaw.
The Diablo Plant has a dozen other problems, including evacuation and plant security.
NO WONDER THOUSANDS OF DEMONSTRATORS WERE ANGRY THAT YOU DARE ISSUE A LICENSE.
You have callously put the 2. 3 billion dollars of the industry
- before the life of the citizens you are supposed to protect.
YOU MUST NEVER ALLOW THE DIABLO CANYON PLANT TO START-UP!
CITY, STATE
/
~
it y
Ouu
/ G D (s c 6 2 0111060606 811o29 PDR ADOCK 05000 pf4 /
Y'
e
~
00LKETED USNRC Mr. Nunzio Palladino Chairman Nuclear Regulatory Commission gj g 29 P4:46 Washington, D. C.
g 0FFICE OF SECRETAF tn, i 00CKEilHG & SE xE A
Dear Mr. Palladino:
BRANCH THE DIABLO CANYON PLANT MUST NEVER OPEN!
L-i' 21 NOVO 61981 4
This reacto. is sited only 3 miles from an earthquake fault, 3 v'5=gg'g"* [
discovered after construction began, s
JP G
Why did not the NRC stop construction immediately ?
g
}
k
~
Now a major flaw involving the stress analysis of pipe supports has been found. This flaw may affect the ability to withstand earth-quakes -- which occur periodically along the Pacific coast.
The PG & E Company, the builder has announced an indefinite delay.
HOW COULD IT BE THAT THIS PLANT WAS ISSUED A LICENSE ?
WHAT KIND OF INSPECTION DOES THE NRC DO ?
Your credibility is zero. You didn't inspect a major diagram. You weren't even able to find a major design flaw.
The Diablo Plant has a dozen other problems, including evacuation and plant security.
NO WONDER THOUSANDS OF DEMONSTRATORS WERE ANGRY THAT YOU DARE ISSUE A LICENSE.
You have callously put the 2. 3 billion dollars of the industry before the life of the citizens yea are supposed to protect.
YOU MUST NEVER ALLOW THE DIABLO CANYON PLANT TO START-UP!
Sincerely, NAME
[
ADDRESS 6 />f h.M p
CITY, STATE
, gg gf 90 3 9
5 'o 7
ED Mr. Nunzio Palladino 00g$ypJe Chairman Nuclear Regulatory Commission Washington, D. C.
11 W 29 P4:46 Lb'8,
Q g
A 0FFICE OF SECRETARYN
~ ~ h I (*
Dear Mr. Palladino:
00CKE.gC g'c UL g
g t10VU 6 I3fI 3 THE DIABLO CANYON PLANT MUST NEVER OPEN!
z....ea w
This reactor is sited only 3 miles from an earthquake fault, N
discovered after construction began.
N Tf-
-3 Why did not the NRC stop construction immediately ?
4 Now a major flaw involving the stress analysis of pipe supports has been found. This flaw may affect the ability to withstand earth-2 quakes -- which occur periodically along the Pacific coast.
The PG & E Company, the builder has announced an indefinite delay.
HOW COULD IT BE THAT THIS PLANT WAS ISSUED A LICENSE ?
WHAT KIND OF INSPECTION DOES THE NRC DO ?
Your credibility is zero. You didn't inspect a major diagram. You weren't even able to find a major design flaw.
The Diablo Plant has a dozen other problems, including evacuation and plant security.
NO WONDER THOUSANDS OF DEMONSTRATORS WERE ANGRY THAT YOU DARE ISSUE A LICENSE.
You have callously put the 2. 3 billion dollars of the industry before the life of the citizens you are supposed to protect.
YOU MUST NEVER ALLOW THE DIABLO CANYON PTANT TO START-UP!
Sincerely, NAME MS. ARUNE PRIGoFF ADDRESS 1360 N.SANCBURG TERRACE #24014 f4 Q,
m cAGo,t m s m CITY, STATE i
O S0.3
.h j
Mr. Nunzio Palladino 00LKETED r>NRC V
Chairman Nuclear Regulatory Commission Washington, D. C.
'81 {E P4:46
Dear Mr. Palladino:
[0CkTfNG SEVih 4
BRANCH D'
g
/
THE DIABLO CANYON PLANT MUST NEVER OPEN!
This reactor is sited only 3 r 'les from an earthquake fault,. h NOVO 619sru.'s discovered after construction began.
u.s. uou,, D s
% "8 Why did not the NRC stop construction immediately ?
s G
Now a major flaw involving the stress analysis of pipe supports if /
~
has been found. This-flaw may affect the ability to withstand earth-quakes -- which occur periodically along the Pacific coast.
The PG & E Company, the builder has announced an indefinite delay.
HOW COULD IT BE THAT THIS PLANT WAS ISSUED A LICENSE 7 WHAT KIND OF INSPECTION DOES THE NRC DO ?
Your credibility is zero. You didn't inspect a major diagram. You weren't even able to find a major design flaw.
The Diablo Plant has a dozen other problems, including evacuation and plant security.
NO WONDER THOUSANDS OF DEMONSTRATORS WERE ANGRY THAT YOU DARE ISSUE A LICENSE.
You have callously'put the 2. 3 billion dollars of the industry before the life of the citizens you are supposed to protect.
YOU MUST NEVER ALLOW THE DIABLO CANYON PLANT TO START-UP!
Sincerely, M
NAME
,y,a;*y,gxog f
ADDRESS Ev== son,rt.so2oi CITY, STATE p Sc3
.s
g' M b? h Y%
f c'
q Mr. Nunzio Palladino 1 LUb %
DOLKETED
-g Uwc Chairman 7
gg 6198p Nuclear Regulatory Commission 2;,,, gg*
j 1
(CT 29 P4:46 Washington, D. C.
g N"
Dear Mr. Palladino:
0FFICE OF SECRETAFY 4
C.'
00CKEilHG & SERVICE BRANCH THE DIABLO CANYON PLANT MUST NEVER OPEN!
This reactor is sited only 3 miles from an earthquake fault, discovered after construction began.
Why did not the NRC stop construction immediately ?
Now a major flaw involving the stress analysis of pipe supports has.been found. This flaw may affect the ability co withstand earth-quakes -- which occur periodically along the Pacific coast.
The PG & E Company, the builder has announced an indefinite delay.
HOW COULD IT BE THAT THIS PLANT WAS ISSUED A LICENSE 7 WHAT KIND OF INSPECTION DOES THE NRC DO ?
Your credibility is zero. You didn't inspect a major diagram. You weren't even able to find a major design flaw.
The Diablo Plant has a dozen other problems, including evacuation and plant security.
NO WONDER THOUSANDS OF DEMONSTRATORS WERE ANGRY THAT YOU DARE ISSUE A LICENSE.
You have callously put the 2. 3 billion dollars of the industry before the life of the citizens you are supposed to protect.
YOU MUST NEVER ALLOW THE DIABLO CANYON PLANT TO START-UP!
Sincerely, NAME Yvonne Schroeder James ADDRESS 729 stewart Ave.
CITY, STATE Elgin, IL 60120 9503 Yo
Ir Nuns.o Palladino 00jE us C dirman Nuclear Regulatory Commission 11 29 P4:46 Washingto:', D. C. g 0FFICE OF SECRETARY
Dear Mr. Palladino:
00CKETggERVICE THE DIABLO CANYON PLANT MUST NEVER OPEN!
[">
This reactor is sited only 3 miles from an earthquake fault,
((i 2_}u.3NOV discovered after construction began.
Why did not the NRC stop construction immediately ?
%@$$!nT' "
g Now a major flaw involving the stress analysis of pipe supports has been found. This flaw may affect the ability to withstand earth-t
't qua' es -- which occur periodically along the Pacific coast.
E-k The PG & E Company, the builder has announced an indefinite delay.
HOW COULD IT BE THAT THIS PLANT WAS ISSUED A LICENSE ?
WHAT KIND OF INSPECTION DOES THE NRC DO ?
Your credibility is zero. You didn't inspect a major diagram. You weren't even able to find a major design flaw.
The Diablo Plant has a dozen other problems, including evacuation and plant security.
NO WONDER THOUSANDS OF DEMONSTRATORS WERE ANGRY l
THAT YOU DARE ISSUE A LICENSE.
You have callousiv nut the 2. 2 billion dollars of the industry before l
l the life of the citizens you are supposed to protect.
YOU MUST NEVER ALLOW THE DIABLO CANYON PLANT TO START-UP!
Sincerely, NAME bbW M
- =
ADDRESS h3 f \\
[
CITY, STATE
(
l s
W,'
BOLO }
pSo 9
~
SfV 1
bh IMg -
WAnL & m)Q 1
5 W(WM RAL 06 k wi
/n,..
m a
,l
-1, n 4
Ilbu I
E h o,OVO 61981* N 7
N DOLMETED Mr. Nunzio Palladino USNRC
...uangym Chairman Nuclear Regulatory Commission 'A
@) 11 (ET P4 :46 Washington, D. C.
~
OFFICE OF SECRETAR~i
Dear Mr. Palladino:
DOCKETlHG & SERVICE BRANCH THE DIABLO CANYON PLANT MUST NEVER OPEN!
This reactor is sited only 3 miles from an earthquake fault, discovered after construction began.
Why did not the NRC stop ccnstruction immediately ?
Now a major flaw involving the stress analysis of pipe supports has been found. This flaw may affect the ability to withstand earth-quakes -- which occur periodically along the Pacific coast.
The PG & E Company, the builder has announced an indefinite delay.
HOW COULD IT BE THAT THIS PLANT WAS ISSUED A LICENSE ?
WHAT KIND OF INSPECTION DOES THE NRC DO 7 Your credibility is zero. You didn'+ inspect a major diagram. You weren't even able to find a major ds en flaw.
The Diablo Plant has a dozen other problems, including evacuation and plant security.
NO WONDER THOUSANDS OF DEMONSTRATORS WERE ANGRY THAT YOU DARE ISSUE A LICENSE.
You have callously put the 2. 3 billion dollars of the industry before the life of the citizens you are supposed to protect.
YOU MUST NEVER ALLOW THE DIABLO CANYON PLANT TO START-UP!
Sincerely, NAME,
ADDRESS CITY, STATE
..g, ysy w
cmcAco, at sosis G
I Wg x m :ss p so3
'n
.