Package of Seven Ltrs Opposing Startup of Facilities
ML20032C008
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/29/1981
From: James Y, Kolotkin R, Luberman S, Prigoff A, Small M, Steven, Wasserman E
AFFILIATION NOT ASSIGNED
To: Palladino N
NRC COMMISSION (OCM)
References
NUDOCS 8111060606
Download: ML20032C008 (7)


Text

D

/

1 DC Mr Nunzio Palladino us RC 110V 0' 61981* 'g

.irman T,m

46 129 P4 Washingt

.C a

s a

OFFICE OF SECRETM 1

Dear Mr. Palladino:

00CKEi g ERVICt THE DIABLO CANYON PLANT.MUST NEVER OPEN!

This reactor is sited only 3 miles from an earthquake fault, discovered after construction began.

Why did not the NRC stop construction immediately ?

Now a major flaw Sivolving the stress analysis of pipe supports has been found. This flaw may affect the ability to withstand earth-quakes -- which occur periodically along the Pacific coast.

The PG & E Company, the builder has announced an indefinite delay.

HOW COULD IT BE THAT THIS PLANT WAS ISSUED A LICENSE 7 V' HAT KIND OF INSPECTION DOES THE NRC DO ?

Your,redibility is zero. You didn't inspect a major diagram. You weren't even able to find a major design flaw.

The Diablo Plant has a dozen other problems, including evacuation and plant security.

NO WONDER THOUSANDS OF DEMONSTRATORS WERE ANGRY THAT YOU DARE ISSUE A LICENSE.

You have callously put the 2. 3 billion dollars of the industry

  • before the life of the citizens you are supposed to protect.

YOU MUST NEVER ALLOW THE DIABLO CANYON PLANT TO START-UP!

Sincerely, AD SS I'

CITY, STATE

/

~

it y

Ouu

/ G D (s c 6 2 0111060606 811o29 PDR ADOCK 05000 pf4 /

Y'

e

~

00LKETED USNRC Mr. Nunzio Palladino Chairman Nuclear Regulatory Commission gj g 29 P4:46 Washington, D. C.

g 0FFICE OF SECRETAF tn, i 00CKEilHG & SE xE A

Dear Mr. Palladino:

BRANCH THE DIABLO CANYON PLANT MUST NEVER OPEN!

L-i' 21 NOVO 61981 4

This reacto. is sited only 3 miles from an earthquake fault, 3 v'5=gg'g"* [

discovered after construction began, s

JP G

Why did not the NRC stop construction immediately ?

g

}

k

~

Now a major flaw involving the stress analysis of pipe supports has been found. This flaw may affect the ability to withstand earth-quakes -- which occur periodically along the Pacific coast.

The PG & E Company, the builder has announced an indefinite delay.

HOW COULD IT BE THAT THIS PLANT WAS ISSUED A LICENSE ?

WHAT KIND OF INSPECTION DOES THE NRC DO ?

Your credibility is zero. You didn't inspect a major diagram. You weren't even able to find a major design flaw.

The Diablo Plant has a dozen other problems, including evacuation and plant security.

NO WONDER THOUSANDS OF DEMONSTRATORS WERE ANGRY THAT YOU DARE ISSUE A LICENSE.

You have callously put the 2. 3 billion dollars of the industry before the life of the citizens yea are supposed to protect.

YOU MUST NEVER ALLOW THE DIABLO CANYON PLANT TO START-UP!

Sincerely, NAME

[

ADDRESS 6 />f h.M p

CITY, STATE

, gg gf 90 3 9

5 'o 7

ED Mr. Nunzio Palladino 00g$ypJe Chairman Nuclear Regulatory Commission Washington, D. C.

11 W 29 P4:46 Lb'8,

Q g

A 0FFICE OF SECRETARYN

~ ~ h I (*

Dear Mr. Palladino:

00CKE.gC g'c UL g

g t10VU 6 I3fI 3 THE DIABLO CANYON PLANT MUST NEVER OPEN!

z....ea w

This reactor is sited only 3 miles from an earthquake fault, N

discovered after construction began.

N Tf-

-3 Why did not the NRC stop construction immediately ?

4 Now a major flaw involving the stress analysis of pipe supports has been found. This flaw may affect the ability to withstand earth-2 quakes -- which occur periodically along the Pacific coast.

The PG & E Company, the builder has announced an indefinite delay.

HOW COULD IT BE THAT THIS PLANT WAS ISSUED A LICENSE ?

WHAT KIND OF INSPECTION DOES THE NRC DO ?

Your credibility is zero. You didn't inspect a major diagram. You weren't even able to find a major design flaw.

The Diablo Plant has a dozen other problems, including evacuation and plant security.

NO WONDER THOUSANDS OF DEMONSTRATORS WERE ANGRY THAT YOU DARE ISSUE A LICENSE.

You have callously put the 2. 3 billion dollars of the industry before the life of the citizens you are supposed to protect.

YOU MUST NEVER ALLOW THE DIABLO CANYON PTANT TO START-UP!

Sincerely, NAME MS. ARUNE PRIGoFF ADDRESS 1360 N.SANCBURG TERRACE #24014 f4 Q,

m cAGo,t m s m CITY, STATE i

O S0.3

.h j

Mr. Nunzio Palladino 00LKETED r>NRC V

Chairman Nuclear Regulatory Commission Washington, D. C.

'81 {E P4:46

Dear Mr. Palladino:

[0CkTfNG SEVih 4

BRANCH D'

g

/

THE DIABLO CANYON PLANT MUST NEVER OPEN!

This reactor is sited only 3 r 'les from an earthquake fault,. h NOVO 619sru.'s discovered after construction began.

u.s. uou,, D s

% "8 Why did not the NRC stop construction immediately ?

s G

Now a major flaw involving the stress analysis of pipe supports if /

~

has been found. This-flaw may affect the ability to withstand earth-quakes -- which occur periodically along the Pacific coast.

The PG & E Company, the builder has announced an indefinite delay.

HOW COULD IT BE THAT THIS PLANT WAS ISSUED A LICENSE 7 WHAT KIND OF INSPECTION DOES THE NRC DO ?

Your credibility is zero. You didn't inspect a major diagram. You weren't even able to find a major design flaw.

The Diablo Plant has a dozen other problems, including evacuation and plant security.

NO WONDER THOUSANDS OF DEMONSTRATORS WERE ANGRY THAT YOU DARE ISSUE A LICENSE.

You have callously'put the 2. 3 billion dollars of the industry before the life of the citizens you are supposed to protect.

YOU MUST NEVER ALLOW THE DIABLO CANYON PLANT TO START-UP!

Sincerely, M

NAME

,y,a;*y,gxog f

ADDRESS Ev== son,rt.so2oi CITY, STATE p Sc3

.s

g' M b? h Y%

f c'

q Mr. Nunzio Palladino 1 LUb %

DOLKETED

-g Uwc Chairman 7

gg 6198p Nuclear Regulatory Commission 2;,,, gg*

j 1

(CT 29 P4:46 Washington, D. C.

g N"

Dear Mr. Palladino:

0FFICE OF SECRETAFY 4

C.'

00CKEilHG & SERVICE BRANCH THE DIABLO CANYON PLANT MUST NEVER OPEN!

This reactor is sited only 3 miles from an earthquake fault, discovered after construction began.

Why did not the NRC stop construction immediately ?

Now a major flaw involving the stress analysis of pipe supports has.been found. This flaw may affect the ability co withstand earth-quakes -- which occur periodically along the Pacific coast.

The PG & E Company, the builder has announced an indefinite delay.

HOW COULD IT BE THAT THIS PLANT WAS ISSUED A LICENSE 7 WHAT KIND OF INSPECTION DOES THE NRC DO ?

Your credibility is zero. You didn't inspect a major diagram. You weren't even able to find a major design flaw.

The Diablo Plant has a dozen other problems, including evacuation and plant security.

NO WONDER THOUSANDS OF DEMONSTRATORS WERE ANGRY THAT YOU DARE ISSUE A LICENSE.

You have callously put the 2. 3 billion dollars of the industry before the life of the citizens you are supposed to protect.

YOU MUST NEVER ALLOW THE DIABLO CANYON PLANT TO START-UP!

Sincerely, NAME Yvonne Schroeder James ADDRESS 729 stewart Ave.

CITY, STATE Elgin, IL 60120 9503 Yo

Ir Nuns.o Palladino 00jE us C dirman Nuclear Regulatory Commission 11 29 P4:46 Washingto:', D. C. g 0FFICE OF SECRETARY

Dear Mr. Palladino:

00CKETggERVICE THE DIABLO CANYON PLANT MUST NEVER OPEN!

[">

This reactor is sited only 3 miles from an earthquake fault,

((i 2_}u.3NOV discovered after construction began.

Why did not the NRC stop construction immediately ?

%@$$!nT' "

g Now a major flaw involving the stress analysis of pipe supports has been found. This flaw may affect the ability to withstand earth-t

't qua' es -- which occur periodically along the Pacific coast.

E-k The PG & E Company, the builder has announced an indefinite delay.

HOW COULD IT BE THAT THIS PLANT WAS ISSUED A LICENSE ?

WHAT KIND OF INSPECTION DOES THE NRC DO ?

Your credibility is zero. You didn't inspect a major diagram. You weren't even able to find a major design flaw.

The Diablo Plant has a dozen other problems, including evacuation and plant security.

NO WONDER THOUSANDS OF DEMONSTRATORS WERE ANGRY l

THAT YOU DARE ISSUE A LICENSE.

You have callousiv nut the 2. 2 billion dollars of the industry before l

l the life of the citizens you are supposed to protect.

YOU MUST NEVER ALLOW THE DIABLO CANYON PLANT TO START-UP!

Sincerely, NAME bbW M

=

ADDRESS h3 f \\

[

CITY, STATE

(

l s

W,'

BOLO }

pSo 9

~

SfV 1

bh IMg -

WAnL & m)Q 1

5 W(WM RAL 06 k wi

/n,..

m a

,l

-1, n 4

Ilbu I

E h o,OVO 61981* N 7

N DOLMETED Mr. Nunzio Palladino USNRC

...uangym Chairman Nuclear Regulatory Commission 'A

@) 11 (ET P4 :46 Washington, D. C.

~

OFFICE OF SECRETAR~i

Dear Mr. Palladino:

DOCKETlHG & SERVICE BRANCH THE DIABLO CANYON PLANT MUST NEVER OPEN!

This reactor is sited only 3 miles from an earthquake fault, discovered after construction began.

Why did not the NRC stop ccnstruction immediately ?

Now a major flaw involving the stress analysis of pipe supports has been found. This flaw may affect the ability to withstand earth-quakes -- which occur periodically along the Pacific coast.

The PG & E Company, the builder has announced an indefinite delay.

HOW COULD IT BE THAT THIS PLANT WAS ISSUED A LICENSE ?

WHAT KIND OF INSPECTION DOES THE NRC DO 7 Your credibility is zero. You didn'+ inspect a major diagram. You weren't even able to find a major ds en flaw.

The Diablo Plant has a dozen other problems, including evacuation and plant security.

NO WONDER THOUSANDS OF DEMONSTRATORS WERE ANGRY THAT YOU DARE ISSUE A LICENSE.

You have callously put the 2. 3 billion dollars of the industry before the life of the citizens you are supposed to protect.

YOU MUST NEVER ALLOW THE DIABLO CANYON PLANT TO START-UP!