ML20032B989

From kanterella
Jump to navigation Jump to search
Opposes Const of Facility
ML20032B989
Person / Time
Site: Diablo Canyon  
Issue date: 10/16/1981
From: Cattoir M
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8111060587
Download: ML20032B989 (1)


Text

.

DOCKETl'UfacEn PROD.& UIl! FAC.k.k,*,M[3 31,).

e 6.s l

U DOCKETED USNRC Ocotber 16, 1%81 $

fy[h' %yb m 00123 A9:04 C

6 y

h h lCDirector 2

Mr. Ha gOVO 5 les;w Nuclea:

e thry Commisston v

g, 1717 H St, North West u.s. unu,,,q

" "8 "

J Wasnington, D. C. 20555 k

Dear Director Denton:

\\P ut Nixon--Watergate.

Pacific Gas & Electric--Diablo Canyon.

Citizens will not tolerate a whitewashing of Diablo Canyon

' design flaws'.

How many other engineering mistakes have been made and are undiscovered?

If we are being protected by the NRC through their inspections why did ehese errors miss detection?

Wat has resident inspector Tolbert Young been doing?

Why does the NRC only do ' audit' inspections and allow PG&E to monitor themselves?

And after they lied about the Hosgri Fault?

The disclosures of Diablo only substantiate the necessity of an evacuation plan as a pre-requisite for a low power test license.

The engineering erronomandate 1) an immediate revocation of the low power test license, 2) a complete re-analysis of the entire seismic design and construction design of the plant from the ground up by an independent entity not subject to ties or pressures from PG&E or the NRC, 3) that John Blume end Assoc-iates be declared incompetent witnesses and that their testimony be stricken from the records upon which seismic safety of Diablo Canyon was based.

It is not logical for a ' fiscally responsible administration' to gamble multi-billions of dollars and years of scientific expertise invested in Vandenberg Missile Base against the albatross of Diablo Canyon.

Diablo Canyon should be admitted as an error of judgment, the license denied.

The Nuclear Regulatory Commission could salvage their credibility, Pacific Gas & Electr3c's credibility has long been gone, and untold esteem and prestige could be gained for the Presidency of the United States.

Perhaps Divine Providence has played a part in the disclosures of these design flaws.

Perhaps a Power greater than all is giving Mankind just one more chance.

I hope you use it well Mr. Denton, 8111060587 hoch[j5 DR ADOCK o Respectfully, PDR p

77/a 6'f Mr & Mrs. Albert C. Cattoir l

P. O. Box 134, Arroyo Grande, Ca. 93420