ML20032B947
| ML20032B947 | |
| Person / Time | |
|---|---|
| Site: | 07001113 |
| Issue date: | 06/30/1981 |
| From: | Vaughan C GENERAL ELECTRIC CO. |
| To: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 8111060541 | |
| Download: ML20032B947 (1) | |
Text
o G E N E R A L $ E LE CTRL;C nuCtenR eneRGv PRODUCTS DIVISION WILMINGTON MANUFACTURING DUAR W N CASTLE HAYNE ROAD e P. O. BOX 780. WILMINGTON, N/
4
. (919 3)3 X r/
s
'.s Inspectionc'f(([
f [f 9(
N Mr. R. C. Lewis, Acting Director Division of Resident & Reactor Project i
//0VO 410
-1 U.
S. Nuclear Regulatery Commission, Region II 8/% -
101 Marietta Street, NW - Suite 3100 v.s. g S7fsge., li cc Atlanta, Georgia 30303 o
v
Dear Mr. Lewis:
5,
,c' S.
,i
'\\
References:
(l' NRC License SNM-1097, Docket #70-1113
~
L-(2) NRC Inspection Report RII/ELC, 70-1113/80-14, dated 10/17/80 (3) GE Response to Inspection Report, dated 11/12/80 In the General Electric Company response to the referea.ed in spect ion, a discussion of measurement verification limits regarding repeated gross weight measurements was included.
GE understands that your staf f plans to perform some degre e of inventory veri'ication during the next regularly scheduled inventory at Wilmington.
The issue of gross weight measurement verification limits needs resolution prior to that time.
A discussion of the measurement system verification conditions and appropriate limits are included as an attachment to this letter.
We welcome further discussion with your staff on this item.
Pin suant to 10 CFR 2.790(d), General Electric Company requests that the attachment to this letter be withheld from public disclosure since this attachment identifies details of General Electric's control and accounting procedures for safeguarding licensed special nuclear material.
Very truly yours, GENERAL ELECTRIC COMPANY A
Charles M. Vaughan, Acting Manager Licensing & Compliance Audits l
M C J26 f
CMV:bmw Attachment SGD-I 811106C541 810630 PDR ADOCK 07001113
[{C3 C
PDR Jb