ML20032B831

From kanterella
Jump to navigation Jump to search
Opposes Licensing of Facilities
ML20032B831
Person / Time
Site: Diablo Canyon  
Issue date: 10/04/1981
From: Kadau L
AFFILIATION NOT ASSIGNED
To: Palladino N
NRC COMMISSION (OCM)
References
NUDOCS 8111060418
Download: ML20032B831 (1)


Text

.

,. m q\\p, \\ w t

s

/[.

6

,so. 7 5,. 3

"!MP 2 r 2

n NOVO 51981*

h.

u.s. wxirAn atGAAmu }

11 5 21 P5:33 comuntuut fjpll3 Q

OTFIC' 0F SECAliA A '

00CMU:NG & SERviCF p/

g, BRANCH Ch 1640 Laguna Drive Ceeano, CA 93445 October 4, 1981 Nunzio J. Palladino, Chairman U. S. Nuclear Regulatory Convaission Washington, D.C.

20555

  • ear Mr. Palladino s

In light of the latest findings in Pacific Cas & Ilectric's Diatlo Canyon nuclear power plant, I strongly urge you to revoke the low-power test license wnica you granted to the company on Septeater 21.

I live in the evacuation zone south of the plant (with no adequate evacuation plan d, and am very much cancerned with the safety factor. If this faulty placement of the seismic pipe restraint systems in Unit i of the plant is any indication of ho'= the cost was put together, I feel that you should really denwesd a : note rigid system of checxs and inspections before allowing even a low. power test license.

A Luli, I wonder if it was ceally acut of intellectual curiosity

  • that

. engineer Hoch tooic another look at those plans for Unit 1 - or is PG&E at last showing some concern for.punlic safety?

Thank you for your thoughtful consideration.

Sincerely, h

Louise Kadau 5t 0 n " doePoggggo, RR

,