Notification of 811103 Meeting W/Util in East Lyme,Ct to Review Isolation Condensor Steam Inlet Piping Water Hammer Incidents & Plant & Operating Procedure Changes to Prevent Recurrence
ML20032B717
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/21/1981
From: James Shea
Office of Nuclear Reactor Regulation
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
NUDOCS 8111060197
Download: ML20032B717 (3)


Text

_

y*

rtr gr

~.xp v

t$

s

~'~

October 21, 1981 MllLY[f Docket No. 50-245

/

' OCT2 21981* T 9

  • mm muna 12 MEMORANDUM FOR:

Dennis M. Crutchfield, Chief w

Operating Reactors Branch f5, DL

-4

)

'FROM:

James J. Shea Project Manager h[Yh s

Operating Reactors Branch #5, DL

SUBJECT:

FORTHCOMING MEETING WITH NORTHEAST NUCLEAR ENERGY COMPANY (NNECO) TO REVIEW DESIGN CHANGES RESULTING

~

FROM MILLSTONE 1 ISOLATION CONDENSER STEAM INLET PIPING WATER llAMER Date:& Time:

Tuesday November 3,1981 Location:

Millstone 1 site, East Lyne Connecticut

Purpose:

To review:

o isolation condenser steam inlet piping water hamer incidents o plant and operating procedure changes that have evolved to prevent recurrance

Participants:

NRC Glainas, WHodges, ASerbiz, RFrahm, JShea and J. T. Shedlosky NNE_C0 PBlasioli, WRomberg, EDeBarba, and George Corneius, et al.

Original signed by James J. Shea, Project Manager Operating Reactors Branch f5 Division of Licensing 8

OcK03o$8$

PDR D.L..:..O. RB.. # ' L:....,R. B O.

omeep suana e> J. haa.4c.,,,,

D. ru t,,,.C.1 d, owey 7..

snc ronu ais oo-soi nacu o24o OFFICIAL RECORD COPY usem i,85+s=4

l MEETING NOTICE DISTRIBUTION Docket NRC PDR Local PDR ORB Reading NSIC DCrutchfield JShea HSm th OELD OI&E (3)

ACRS [10)

SVarga TIppolito RClark JStci:

SEPB Glainas WHodges ASerbi:

e, RFrahm JTShedlosky

-~

h 1

8 o

UNITED STATES

^

'g NUCLEAR REGULATORY COMMISSION o

{

,c WASHING TON, D. C. 20555 c

's,,

/

October 21, 1981 Cocket No. 50-5 f-

[

c sk HEMORANDUM FOR)(Jperating Reactors Branch #5, DL /,

Dennis. M. C"utchfield, Chief

/

\\

s y

FROM:

J%es J. Shea, Project Manager /

Opehting Reactors Branch #5,'DL

\\

SU3 JECT:

FORTHC0gINGMEETINGWITHNORTHEASTNUCLEARENERGY COMPANY {LSTONE1ISOLATIONCONDENSERSTEAM NNECO) TO REVIEW DESIGN CHANGES RESULTING FROM MIL PIPING WATEp HAMMER g' y

n

'N D

Date:

Tuesday f' s November 3,193{,.

MillstoneIsite,'Igt Location:

East'Lyrejonnecti

Purpose:

To resie[

\\

oisoltioncondensersItaminletpipingwaterhammer

,\\

'inc'idents

.\\

/

4 i

o,jlant and operating procedure changes that have

/ evolved tc prevent recurrance

/

\\

Participants:

NRC 3

n.

y 8

Glainas; WHooges, ASerbiz. RFrahbii JShea and J. T. Shedlosky h

/

NNEC0 i

,N N

PBlasioli, WRomberg, EDeBarba, and Geogge Corneius, et al.

l

[

)W

\\

C 3

James J.

'ea, Prcject Mqnager i

Operating Reactors Branchi #5 Division of Licensing i

\\x

fk CL 04 DRAFT DRAFT g

Q gg O c <- 2 i

..-,..s...~.

We have reviewed your responses to our' questions relating to the Millstone 1.-

~

1071981 water ammer event and plan to meet with NNEC0 representatives August I

in early November 1981 to discuss tie following:

1.

Basis for new feedwater controller

~

2.

Displacement uf anchor bolts, you believe, resulted from slippage in the d-concrete slab due to relaxation of the pr21oad.

Explcin relaxation mechanistically.

l

~

l 3.

Amplify your reqpons elative to axial piping stresses, minimal stress concentrations and fa iguc effects at reinforcing pads.

4.

Discuss the expected consequences if i

l.

e Mai. ' steam isolation had occurred concident with scran, from 100% power o Main steam isolation had occurred or would have occurred after automatic turbine trip

-+-

L

~

and explain the basis for operator trip procedures following reactor scram (any inprovements from previous water hammer events).

7 xt..

5.

There are four reported isolation condenser piping water hammer events, _

7:

February 12, 1976, March 1978, December 19, 1979 and August 10, 1981.

~

h Please compere the event sequences i

k 6.

Provide assurance that an undetected iso-condenser pipe crack would not result in pipe failure during water hammer conditions.

7.

Discuss the tests completed to assure that UT devices perform satisfactorily on the scram discharge volume header.

8.

How was isolation condenser pip _ing integrity confirmed following the water hammer event? ('u4 uw A prWcd

~

9.

Provide Figures 7 and 8 referenced in yo'u[ earl'ier' answer to Question 8.

10.

Discuss the response expected for August 10, 1981 transient if the feedwater pump trip had been installed.

ia i

l i

.