Forwards IE Insp Repts 50-416/81-37 & 50-417/81-15 on 810915-18.No Noncompliance Noted
ML20032B437
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 10/02/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20032B438 List:
References
NUDOCS 8111050545
Download: ML20032B437 (2)


See also: IR 05000416/1981037

Text

______ ______ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

. _ _ _ _ _ _ _ _ _ .

_ - _ . _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ - _ _ _ _ .

.

,

,

1

OCT 2 - 1981

\\ \\ mp10)

/ ,.

Mississippi Power and Light Company

ATTN: Mr. N. L. Stampley

E

NOV0 41985.F

-

Vice President of Production

u,,, %

)/

P. O. Box 1640

.

%sso.

s

Jackson, MS 39205

  • s

f'/ 9 (O,fy/

Gentlemen:

Subject: Report Nos[-416/81-3Ddd 50-417/81-15

This refers to the routine safety inspection conducted by Mr. W. P. Ang of this

office on September 15-18, 1981, of activities authorized by NRC Construction

'

Permit Nos. CPPR-118 and CPPR-119 for the Grand Gulf facility and to the discus-

sion of our findings held with Mr. G. B. Rogers, Project Manager at the conclu-

sion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

.

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your inten-

tion to file a request for withholding; and (b) submit within twenty-five days

from the date of this letter a written application to this office to withhold

such information. If your receipt of this letter has been delayed such that less

than seven days are available for your review, please notify this office promptly

so that a new due date may be established. Consistent with section 2.790(b)(1),

such application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part thereof sought to be withheld,

and a full statement of the reascns on the basis of which it is claimed that the

-

information should be withheld from public disclosure.

This section further

'

requires the statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The information sought to be withheld shall be. incorporated

-

as far as possible into a separate part of the affidavit.

Tf we do not hear f rom

you in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

.,

ee

rerot

3 ,ff

-

.

.

Mississippi Power and Light Co.

2

007 2 - 193;

Should you have any questions concerning this letter, we will be glad to discuss

them wito you.

Sincerely,

R. C. Lewis, Director

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report Nos. 50-416/81-37,

50-417/81-15

cc w/ encl:

D. C. Gibbs, Vice President

Middle South Energy, Inc.

C. K. McCoy, Plant Manager

bcc w/ encl:

Document Management Branch

,

State of Mississippi

NRC Resident Inspector

l

I

i

RII

RII

RII

RII

RII

I

L b~

j ',

g(

g/L

'.)yty

l

Wang:es

A4 t

CEflurphy

yG- AFGibson

PTaylor

Clewis

9/1 1/81

/ //81

1 0/ / / 81

10/ / /81

10/ / / 81

10/g,/dl

!