Text
'
-
.
x
'
.. .
.
.
.
'
,
M
OCT 16
x
Docket Nos. 50-277
E y :::
50-278
p
-
4
Philadelphia Electric Company
/
ATTH: Mr. S. L. laltroff
4
fl0VO 41987 m
Vice President
kr
p
'I
Electric Production
. [ "co.EucH
{,4
A
y
2301 Market Street
.
Philadelphia, Pennsylvania
19101
s
b
&
-
Gentlemen:
Subject: Combined Inspection 50-277/81-20 and 50-278/81-22
This refers to the routine safety inspection conducted by Messrs. C. J. Ccwgill and
A. R. Blough of this off'ce on September 4 - October 6,1981 at Peach Bottom Atomic
Power Station, Delta, Fennsylvania of activities authorized by NRC License Nos. DPR-
44 and DPR-56 and to the discussions of our findings held by Mr. Cowgill with Mr. W.
T. Ullrich of your staff at the conciusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection and
Enforcenent Inspection Report which is enclosed with this letter. Within these areas,
the inspection consisted of selective examinations of procedures and representative
W
records, interviews with personnel, and observations by the inspector.
Our inspector also verified the steps you have tcken to correct Noncompliance Item
B.1 broucht to your attention in a letter dated September 24, 1980. We have no fur-
ther questions reoarding your action at chis time.
Based on the results of this inspection, it appears that one of your activities was
not conducted in full compliance with NRC requirements, as set forth in the Notice
of Violation, enclosed herewith as Appendix A.
This item of noncompliance has been
categorized into the levels described in the Federal Register Notice (45 FR 66754)
dated October 7, 1980. You are required to respond to this letter and in preparing
your response, you should follow the instructions in Appendix A.
,
_
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this let-
ter and the enclosures will be placed in the NRC's Public Document Room.
If this
report contains any infc mtion that you (or your contractors) believe to be exempt
from disclosure under 10 F
9.5(a)(4), it is necessary that you (a) notify this office
by telephone within ten (l' j days t.m the datr of this letter of your intention to
file a request for withhc ding; and (by submit within 30 days from the date of this
.
letter a written application to this office tJ witthold such information. Consistent
-
with Section 2.790(b)(1), any such applicat;on musc be accompanied by an affidavit
executed by the owner of the information which identifies the document or part sought
T)O[5
RI:
RI:D PI
_
RI: PI
RI:DRPI
$
Wk
McCae&
Keimig
3
Cow
/meo
Blo{u t/l5
h
ia W
10/13/81
'b
e111050354 Biloi6
}b
e
PDR ADOCK 05000277
O
POR
OFFICIAL RECORD COPY
. . . . . .
_
I
.
.
..
-
<
.
.
OCT 16 S
Philadelphia Electric Company
2
to be withheld, and which contains a full statement of the reasons on the basis which
it is claimed that the information should be withheld from public disclosure. This
section further requires the statement to address with specificity the considerations
listed in 10 CFR 2.790(b)(4). The information sought to be withhold shall be incor-
porated as far as possibic into a separate part of the affidavit.
If we do not hear
from you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room. The telephone notification of your intent to
request withholding, or any request for an extension of the 10 day period which you
believe necessary, should be made to the Supervisor, Files, Mail and Records, USt!RC
Region I, at (215) 337-5223.
Should you have any questions concerning this inspection, we will be pleased to dis-
cuss them with you.
Sincerely,
etAeGL.b.A<M b
R. R. KeimIg, Chief
Projects Branch tio. 2, Division of
Resident and Project Inspection
Enclosures:
1.
Appendix A, liotice of Violation
2.
Combined Office of Inspection and Enforcement Inspection
Report liumber 50-277/81-20 and 50-278/81-22
cc w/encls:
W. T. Ullrich, Station Superintendent
Troy B. Conner, Jr. , Esquire (Without P.eport)
Eugene J. Bradley, Esquire (Ulthout Report)
Raymond L. Hovis, Esquire (Without Report)
l
litchael J. Scibinico, II, Assistant Attorney General (Without Report)
Public Document Room (PDR)
local Public Document Room (LpDR)
Nuclear Safety Information Center (flSIC)
f!RC Resident Inspector
Comonwealth of Pennsylvania
bcc w/encls:
'
Region I Docket Room (with concurrences)
Troy B. Conner, Jr. , Esquire
Eugene J. Bradley, Esquire
Raymond L. Hovis, Esquire
Michael J. Scibinico, II, Assistant Attorney General
Chief, Operational Support Section (w/o encls)
0FFICIdLRECORD