ML20032A876
| ML20032A876 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 10/06/1981 |
| From: | Sternberg D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Mattimoe J SACRAMENTO MUNICIPAL UTILITY DISTRICT |
| Shared Package | |
| ML20032A877 | List: |
| References | |
| NUDOCS 8111020501 | |
| Download: ML20032A876 (2) | |
See also: IR 05000312/1981026
Text
_.
_
- _ _ _ _ _ _ _ _ _ _ _ _ _
-
- _ _ _ -
h
p*
.
,
,
N
j
OCT 6 1981
Oh
to
Docket No. 50-312
2
9'
- % }/O' /Sg g 7
2
g -
Sacramento Municipal Utility District
P. O. Box 15830
D
%,.g
6
Sacramento, California 95813
Attention: Mr. John J. Mattimoe
24
g
'
Assistant General Manager and Chief Engineer
Gentlemen:
Subject: NRC Inspecticn
This refers to the inspection conducted by Messrs. P. J. Morrill and
J. P. Steuart of this office on September 3-4 and 10-11,1981, of activities
authorized by NRC License No. DPR-54, and to the discussions of our findings
held by Messrs. Morrill and Stewart with Mr. R. Rodriquez and other members
of your staff on September 4 and 11,1981.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspectors.
No items of noncompliance with NRC requirements were identified within
the scope of this inspection.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any infomation
that you (or your contractors) believe to be exempt from disclosure
under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office
by telephone within ten (10) days from the date of this letter of your
intention to file a request for withholding; and (b) submit within
25 days from the date of this letter a written application to this
office to withhold such infomation.
If your receipt of this letter has
been delayed such that less than seven (7) days are available for your
review, please notify this office promptly so that a new due date may be
established. Consistent with section 2.790(b)(1), any such application
811102 0[O l
C
gd
k
01
1
A ,
. ..Ry/j k,,q,{h
,, p g, yg,M .,p
1
"'">
-
-
,,
,
,
,,
, , ,
"""'>
S.T EWART". ..
..MORR LL..
..YOU Ga
.SIE8NBERG..
. . .
..
.. . . ..
. ...
.
. .
. . 1./81
10/.6/81
10/ 5 /81
10/ /81
i
10/
mu)
.
.. .. ...
.
. .. .
.
..
. . .
. .,.., , , ,
. . . . . . . . .
.
.
,
NRC FORM 318 Hor 8CI NRCM O2
OFFICIAL RECOFiD COPY
"* '* -32n2 4
_
_ _ _ _ _ _ _ _ _ _ _ _ _
_
.
_
_
_ .__
_
.g
.
g ,-
Sacramento Municipal ~ Utility District
-2-
OCT
61981
.;
must be accompanied by an affidavit executed by the owner of the information
i:
which identifies the document or part sought to be withheld,' and which
contains a full statement of the basis on which it is claimed that the
infomation should be withheld from public disclosure.
This section
further requires the statement to address with specificity the. considerations
listed in 10 CFR 2.790(b)(4). .The infonnation sought to be withheld
~
shall be incorporated as far as possible into a separate part.of the
If we do not hear from you in this regard within the specified -
periods noted above, the report will be placed in the Public Document
Room.
!
Should you have any questions concerning this inspection, we will be
~ glad to discuss them with you.
,
Sincerely,
'
'
p nn . ster % ry
i
.f
D. M. Sternberg, Chief
Reactor Operations Project Branch
,
'
Enclosure:
IE Inspection Report
,
tio. 50-312/81-26
-cc w/o enclosure:
R. J. Rodriguez, SMUD
L. G. Schwieger, SMUD
l
bec: DMB/ Document Control Desk (RIDS)
Distributed by RV:
State of CA (Hahn/ Johnson)-
Resident Inspector (H. Canter)
Engelken (1tr)
t
>
J
4
i
L
---
. -
--- -- --
-
-
-
-
- -
-
. . -
- -
---
.