Forwards IE Insp Repts 50-546/81-17 & 50-547/81-17 on 810901-30.No Noncompliance Noted
ML20032A866
Person / Time
Site: Marble Hill
Issue date: 10/20/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
Shared Package
ML20032A867 List:
References
NUDOCS 8111020486
Download: ML20032A866 (2)


See also: IR 05000546/1981017

Text

3>

DCT 2 0 198;

. / cp 1 (t k': ( q-

\\'

Docket No. 50-546

6

(

0./

'

Docket No. 50-547

7

OL b*%

'

9

%

007O O 193l3,7

Public Service of Indiana

12

_,

y,, Q y*e g"8

ATTN:

Mr. S. W. Shields

D;

-

Senior Vice President

Nuclear Division

/

/

AM%

N

Post Office Box 190

New Washington, IN 47162

N W

Gentlemen:

This refers to the routine safety inspection con' ducted by Mr. J. J. ' Harrison

of this office on September 1-30, 1981, of activities at Marble Hill Nuclear

Generating Station, Units 1 and.2, authorized by NRC Construction Permits

No. CPPR-170 and No. CPPR-171 and to the discussion of our findings with

Messrs. Petro, Ramsett, and others of your staff at the conclusion of the

inspection.

The encloced copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

,

terviews with personnel.

t

No items of noncompliance with NRC requirements were identified during the

,

'

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation.

Section 2.790(b)(1) requires that any such application must be

i -

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains-

,

a full statement of the reasons which are the bases for the claim that the

4

-

S%

"1"=ogtj

V

4

Public Service of Indiana

-2-

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-

porated as far as possible into a separate part of the affidavit.

If we do

not hear from you in this regard within the specified periods noted above, a

copy of this letter and the enclosed inspection report will be placed in the

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

3*'

R. L. Spessard, Director

Division of Resident and

"

Project Inspection

Enclosure:

IE Inspection

Reports No. 50-546/81-17

and No. 50-547/81-17

cc w/ encl.

W. M. Petro, Executive Director

Nuclear Project Management

C. Kammerer, CA

J.11. Sniezek, IE

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

LeBoeuf, Lamb, Leiby & MacRae

Dave Martin, Office of

Attorney General

John R. Galloway, Staff Director,

Environment, Energy and Natural

Resources Subcommittee

E. P. Martin, Wabash Valley

Power Association

h

RII n

l.-l

RIII ,

_J(IJII _

g

y

Li tle so

Sttecter

Spessard

10/13/81

lOjjg

10 /iq

- -

-

-

-

.

.

.