ML20032A809

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 81-02, Failure of Gate Type Valves to Close Against Differential Pressure. No Westinghouse Motor Operated Gate Valves Installed or Maintained at Facility
ML20032A809
Person / Time
Site: Fort Calhoun 
Issue date: 09/17/1981
From: William Jones
OMAHA PUBLIC POWER DISTRICT
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
IEB-81-02, IEB-81-2, NUDOCS 8111020430
Download: ML20032A809 (1)


Text

.

O Omaha Public Power District 1623 HARNEY a O M A H A, net 3RASKA 68102 m TE LEPHON E S36-4000 AREA CODE 402 September 17, 1981 A'

C Mr. K. V. Seyfrit, Director

.c D

'} g U. S. Nuclear Regulatory Commission g

Office of Inspection and Enforcement pg Region IV T

OCT3 01981* L 611 Ryan Plaza Drive, Suite 1000 Ej u, mum Arlington, Texas 76011 wmc+$

8 N

/

Reference:

Docket No. 50-285

Dear Mr. Seyfrit:

IE Bulletin 31-02, Supplement 1, requested the District to deter-mine whether Westinghouse motor-operated gate valves are installcd or are maintained as spares for installation in safety related systems at the Fort Calhoun Station. The District has verified that the subject Westinghouse motor-operated gate valves are not installed or maintained as replacements at the Fort Calhoun Station.

li:erefore, no further action is necessary.

The Commission also requested the District to estimate the manhours expended in the review and preparation of this bulletin response. The District estimates three manhours were required to conduct this review and prepare a response.

lS'pcerf),AApte i i W. C. dones Divisidn' Manager Production Operations WCJ/KJM/TLP/RWS:jm:n cc:

U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Washington, D.C.

20555 LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.

Washington, D.C.

20036 811102 0 f.J

/bO O/#

@