ML20032A546
| ML20032A546 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 10/26/1981 |
| From: | Devincentis J PUBLIC SERVICE CO. OF NEW HAMPSHIRE |
| To: | Tedesco R Office of Nuclear Reactor Regulation |
| References | |
| SBN-187, NUDOCS 8110300325 | |
| Download: ML20032A546 (2) | |
Text
.-
NN companyofNew6 SFAR00K STATION Engineering Office:
1671 Worcester Road Framingham, MA 01701 O
{\\
S OCT2919373tsl.
Q "@fymu y October 26, 1981 SBN-187 f\\
b,/
M T.F. B 18.5.4 N
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Atten tion :
Robert L. Tedesco, Assistant Director Division of Licensing
References:
(a) Construction Permits CPPR-135 and CPPR-136, Docket Nos.
50-443 and 50-444, (b) USNRC letter dated July 23,1981, " Prompt Notification in the Event of an Emergency", R. L. Tedesco to W. C. Tallman
Subject:
Seabrook Prompt Notification System
Dear Mr. Tedesco:
Reference (M requested confirmation that an emergency public notification capability that caets the regulatory requirements of 10CFR50, Appendix E, Section IV.D.3 will be present within the Seabrook Station plume exposure EPZ prior to issuance of ac opera ting license.
The purpose of this letter is to offer this confirmation. Presently the State of New Hampshire is engaged in the selection of a consultant for emergency planning assistance. The consultant selection is imminent. Included in the many areas to be addressed are an identification of current warning capability, comparison with the guidelines of NUREG-0654, and recommendations for methods for upgrading current capability to the level specified in the guidelines.
The New Hampshire Civil Defense Agency has specified that the consultant selected should address the prompt notification area by this time next year.
8110300325 811026
{DRADOCK 05000443 M
L PDR V
t I k 6
E i
,,, A
~
-U. S. Nucl2cr Riguletsry Ccamiccion October 26,.1981 Page 2 The recommended methods for warning capability: improvements will be reviewed by New Hampshire officials, Massachusetts officials, FEMA and PSNH.
Implementation of acceptable capability upgrades will commence 'at that time.
i Very truly'yours,-
YANKEE' ATOMIC ELECTRIC COMPANY 04N N
'.) 6 g'
(
' fpor $ John DeV nMntis Project' Manager i
cc: Brian Crimes, Director Division of Emergency Preparedness Louis Wheeler, Project. Manager Seabrook Project' e
_m