Final Rept DER 81-31 Per IE Info Notice 81-08 Re Installation of Std Steel Key in Limitorque Valves Instead of 4140 Steel key.C-E to Update Valves & Bechtel to Issue Design Change Packages to Assure Corrective Action
ML20032A528
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/15/1981
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-19166-GHD, IEIN-81-08, IEIN-81-8, NUDOCS 8110300298
Download: ML20032A528 (3)


Text

__

~ _.

! D o'c k e t N o s.- 50-528,529,530

(

50,75(o).R0 port h

P. oL BOX 21666 PHOENIX, ARIZON A 85038 October 15, 1981 ANPP-19166-CHD/BSK

,14 to 3

~

U. S. Nuclear Regulatory Commission Region V

((

b Creekside Oaks Office Park

~4 e OCT;) g IS8/A C 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5so8

v.,

y, p

Attention:

Mr. B.'.H. Faulkenberry, Chief d,

Reactor Construction and-V'),

Engineering Support Branch N/

Subj cet:

Final Report DER _81-31 A 50.55(e) Reportable Condition Relating to Limitorque Valve Operator Shaft Key Material Substitution,Per NRC IE Information Notice No. 81-08 File:

81-019-026 D.4.33.2

Reference:

Telephone Conversations between J. Eckhardt and G. H.

Duckworth of September 10 and October 14, 1981

Dear Sir:

Attached, is our final written report of the reportable deficiency,

-under 10CFR50.55(e), referenced above.

Very trul piurb

~.-

C C,

cq\\

ALW E. E. Van Brunt, Jr.

APS Vice Fresident Nuclear P*ojects ANPP Project Director EEVBJr/GHD:ske

[

Attachment c) cc: See Attached gj 5'd g

f 5

N mo

.5!

E5h m

2 a

m en

~~O G110300298 81'1015 PDR ADOCK 05000528 71 l %-

s PDR

s.

U...S..Nucl.,Ir Regulctery Co==1*ci:n-

' Attention:

Mr. B..H.~Faulkenberry, Chief:

ANPP-19166-GHD/BSK(

October' 15, 1981"

- Page 2

cc: Victor Stello,'Jr.,' Director.

U.' S.. Nuclear Regulatory Commission Office'of Inspection and Enforcement Washington, D. C.

20555 J. A. Roedel D.'B. Fasnacht G. C. Andognini.

F...W.-Hartley _

.J. M. Allen A. C.. Rogers B. S. Kaplan W. E. Ide J. Vorees J. A.-Brand A. C. Gehr W. J. Stubblefield W.'G. Bingham R; L. Patterson R. W. Welcher

.R. M. Grant-D. R. Hawkinson L. E. Vorderbrueggen Ms. Patricia Lee Hourihan 6413 South 26th Street

-Phoenix, Arizona 85040 t

,f e

k

+

t 9

m i_,____

mm..

m.

2.

.a... m2 m

y..

J ?.

S

.j.

c 3 f.:

1

/

-FINAL REPORT.- DE?t 81-31:

.RE"ORTABLE DEFICIENCY 50.55(e):

' ARIZONA PUBLIC. SERVICE COMPANY-(APS) s

.y PVNCS UNITS,1,-;2 AND 3 d

-I..

Description'of Deficiency-

NRC IE ;Information Notice No.- 81-08 notified
the Project to investigate the application ~of Limitorque Valve-Operators for correct material usage of the. motor-to-shaft-

" key wherein a standard type 1018? steel key had.been in-stalled instead of the required 'special type 4140 steel--

key.:

The Project review has resulted in four~(4) SMB-3

~

-Operators falling within this classification as follows:

~

Tag No.

CE Nuclear Valve Division SI-615, -625, -635, -645 Part No. 79540 II. JAnalysis of Safety Implications Thir con'dition is ' evaluat'ed as-Reportable since, if lof t -

uncorrected, the' incorrect key meterial could possibly-result in a safety-related valve malfunction.

.III.

Corrective Action As per Combustion Engineering Letter V-CE-14953, dated Iagust ?0,'1981, CE will obtain the 4140 key material and

~

certificates from Limitorg e and b.tve the affected valves.

. updated with th.s c.odification p.or to fuel load. Bechtel Design Change 1 tckages ISM-SI-02'!, 2CM-SI-029 and 3CM-SI-029 are being ie9 red to provide. follot-up and assure completion of the corrective action.

This corrective action will also be audited by.the Quality Assurance Departmen".

/

I i

...n l

'