ML20032A457
| ML20032A457 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 10/23/1981 |
| From: | Wambach T Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20032A451 | List: |
| References | |
| NUDOCS 8110290614 | |
| Download: ML20032A457 (2) | |
Text
_ _ _ _ _ _ _ _ _ _ _
7590-01 UNITED STATED NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-213 CONNECTICUT ~ YANKEE-ATOMIC POWER COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE
~
The U. S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 43 to Facility Operating License No. DPR-61, issued to Connecticut Yankee Atomic Power Company (the licensee), which revised the Technical Specifications for operation of the Haddam Neck Plant (the facility). located in Middlesex County, r nnecticut.
The amendment is effective as of its date of issuance.
The amendment changes the Technical Specifications to incorporate revisions to the limit curves for hydrostatic and. leak testing.
~
The -application for the amendment complies with the standards and requirements of _the Atomic Energy Act of 1954, as amended (the Act),
and the Commission's rules and regulations.
The Commission has made
~
appropriate findings as required by the Act and the Commission's rules i
and regulations in 10 CFR Chapter I, which are set -forth in the license amendment.
Prior public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.
The Commission has determined that the issuance of this amendment will
- not result in any significant environmental impact and that pursuant to 10 '
CFR 551.5(d)(4) an environmental impact statement or negative declaration
~and environniental impact appraisal need not be prepared in connection with the issuance of this amendment.
8110290614 811023" DR ADOCK 05000 l
e 7590-01 o
- For further details with respect to this action, see (1) the application for amendment dated September, 28, 1981, (2) Amendment No. 43 to License No. DPR-61, and (3) the Commission's related Safety Evaluation. All of these items are available for pubitc. inspection at the Commission's Public Document Room,1717 H Street, N. W., Washington, D.
C., and at the Russell Library,119 Broad Street, Middletown, Connecticut 16457.
A copy of items
- (2) and (3) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C., 20555, Attention:
- Director, Division of Licensing.
Dated at Bethesda, Maryland, this 23rd day of October,1981.
FOR THE NUCLEAR REGULATORY COMMISSION
%W#
M Thomas V. Wambach, Acting Chief Operating Reactors Branch #5 Division of Licensing e
O