ML20031G275
From kanterella
Jump to navigation
Jump to search
Letter Sequence Request | |
|---|---|
Administration Questions
| |
MONTHYEARML20031G2751981-10-20020 October 1981
[Table View]Transcript of 811020 Hearing in Washington,Dc.Pp 128- 203 Project stage: Request ML20039D5181981-12-21021 December 1981 Part 21 Rept Re Design Defect on Micro Computer Printed Circuit Board of Micro computer-based Radiation Monitoring Sys.Vendor Will Supply Board W/Latch Which Prevents Interrupt Data from Changing While Being Read Project stage: Other ML20052C8871982-04-26026 April 1982 Forwards Update to NUREG-0737 Schedule Requirements & Implementation Status Project stage: Other ML20065G3611982-09-24024 September 1982 Discusses Revision of Plant Emergency Response Procedures Specifying Necessary Precautions Required Before post- Accident re-entry Into Auxiliary Bldg or Facade,In Response to 820914 Request for Info Re NUREG-0737,Item II.B.2 Project stage: Request ML20069G8811982-10-15015 October 1982 Advises of Mod to RCS Gas Vent Sys to Prevent Operation of Power Operated Valves During Normal Plant Operation,Per 821012 Telcon.Physical Restraining Device Fitted on or Over Valve Operator Switch Project stage: Other ML20023B1861982-12-17017 December 1982 Discusses Installation of RCS Gas Vent Sys During Fall 1982 Refueling Outage.Several Minor Mods to as-designed Piping & Piping Supports Necessary to Accommodate Interferences from Other Components & Sys in Containment Project stage: Other ML20069A6321983-02-28028 February 1983 Forwards Addl Info Re NUREG-0737,Item II.F.1.4, Containment Pressure Monitor, Item II.F.1.5, Containment Water Level Monitor & Item II.F.1.6, Containment Hydrogen Monitor, in Response to NRC Project stage: Other ML20023C7511983-05-0909 May 1983 Exemption from Schedular Requirements for Installation of RCS High Point Gas Vents Allowing Delay in Installation of Sys Util 840101 Project stage: Approval ML20076J0271983-06-16016 June 1983 Informs of Further Delay in Implementing post-TMI-related Issues Due to Delay in Shipment of Auxiliary Safety Instrumentation Panels from Vendor,In Response to 830314 Order Project stage: Other ML20080D6201983-08-24024 August 1983 Suppls 830415 Response to Generic Ltr 82-33 Re Schedule Requirements for Emergency Response Capabilities,Per Suppl 1 to NUREG-0737.Implementation Dates for Emergency Response Capabilities Revised as Listed Project stage: Other IR 05000266/19830171983-10-12012 October 1983 IE Insp Repts 50-266/83-17 & 50-301/83-16 on 830808-0922. Noncompliance Noted:Failure to Perform Appropriate Contamination Survey of Radioactive Matls Shipment Project stage: Request ML20082M8401983-11-29029 November 1983 Requests Schedular Exemptions from 10CFR50.44 for RCS Gas Vent Sys,Granted in NRC 830125 & 0509 Ltrs,Be Extended to Reflect Revised Completion Date of Dec 1984 for RCS High Point Gas Vents Project stage: Other 1982-09-24 |
| ML20031G275 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 10/20/1981 |
| From: | Atomic Safety and Licensing Board Panel |
| To: | |
| References | |
| ISSUANCES-OLA, NUDOCS 8110220087 | |
| Download: ML20031G275 (77) | |
Similar Documents at Point Beach | |
|---|---|
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20031G275&oldid=4596876"