Forwards IE Insp Repts 50-456/81-12 & 50-457/81-12 on 810909-11,16 & 22.No Noncompliance Noted
ML20031G055
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 10/08/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20031G056 List:
References
NUDOCS 8110200737
Download: ML20031G055 (2)


See also: IR 05000456/1981012

Text

.'

.

.

OCT

8 1981

TIIen \\

'/

1

'S

%

3

Docket No. 50-456

I

.

g

C

Docket No. 50-457

-

-

0C119 #, ,_N

Commonwealth Edison Company

\\;\\

v.otggd#,, Q

ATTN:

Mr. Cordell Reed

Vice President

'

Post Office Box 767

EkrQ p

,

,

Chicago, IL 60690

m.

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

J. F. Norton, R. B. Landsman and J. M. Hinds of this office .$

September 9, 10, 11, 16 and 22, 1981, of activities at Braidwood Station,

Units 1 and 2, authorized by NRC Construction Permits No. CPPR-132 and

No. CPPR-133 and to the discussion of our findings with Mr. R. Cosaro and

others of your s'.aff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CLR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room

If this report containe any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation.

Section 2.790(b)(1) requires that any such application must be

h

s

I

8110200737 811008

PDR ADOCK 05000456

G

PDR

.

-

-.

_.

-

_

-

-

-

-- -

_

.

,

,

Commonwealth Edison Company

-2-

OCT . 81981

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contain:.

a full statement of the reasons which are the bases for the claim that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-

l

porated as far as possible into a separate part of the affidavit.

If we do

not hear from you in this regard within the specified periods noted above, a

'

copy of this letter and the enclosed inspection report will be placed in the

d.

Public Document Room.

We will gladly discuss ag questions you have concerning this inspection.

Sincerely,

1

8.e. Mleu-~ fa.

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

,

l

Enchsure:

IE Inspection

Rtports No. 50-456/81-12

+

and No. 50-457/81-12

cc w/ enc 1:

Louis 0. De1 George

Director of Nuclear

Licensing

R. Cosaro, Project

Superintendent

V. I. Schlosser,

,

j

Project Manager

'

J. F. Gudac, Station

Superintendent

DMB/ Document Control Desk (RIDS)

Mary Jo Murray, Office of

Assistant Attorney General

i

.

Rik)

hjgl'

jdO

{k t r/0 '-

RIII.

RIII

RTI

fl I

RII

RIII

,

l

/

4

_ Hawkins

Neislet

Williams

Norelius

6

'

Nor , n/jp

Landsman Hinds

i

o

i;j )-ll

9/30/81

,;

-

-

-

-