Forwards IE Insp Rept 50-416/81-35 on 810908-11.No Noncompliance Noted
ML20031F988
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/01/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML20031F989 List:
References
NUDOCS 8110200620
Download: ML20031F988 (2)


See also: IR 05000416/1981035

Text

Q-

ell0W

>

l

l

,

OCT 011981

, g (%@

N

Mississippi Power and Light Company

'N

ATTN: Mr. N. L. Stampley

QS

4,

pV

Vice President of Production

2

Og7

g ,4 ,3

u,,,'lpg./ g ISB-

-

P. O. Box 1640

',-

Jackson, MS 39205

C

/s

Uh

\\,

Gentlemen:

,

x/

Subject: Report No. 50-416/81-35

Y

[

This refers to the routine safety inspection conducted by Mr. A. H. Johnson of

this office on September 8-11, 1981, of activities authorized by NRC Construction

Permit No. CPPR-118 for the Grand Gulf facility and to the discussion of our

findings held with Mr. G. B. Rogers, Jr. , Site Manager, at the conclusion of the

inspection.

Areas examined durir.g the inspection and our findings are discussed in the

enclosed inspection report.

Within tnese areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and cbservations by the in.spectors.

Within the scope of this inspection, no violations or deviations were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that yme (a) notify this office

by telephone within ten days from the date of this 1

- of your intention to

file a request for veithholding; and (b) submit within twenty-five days from the

date of this letter a written application to this office to withhold such infor-

mation.

If your receipt of this letter has been delayed such that less than

seven days are available for your review, please notify this office promptly so

that a new due date may be established. Consistent with section 2.790(b)(1),

such application must be accompanied by an affidavit exe uted by the owner of the

information whicn identifies the document or part thareof sought to be withheld,

and a full statement of the reasons on the basis of which it is claimed that the

information should be withheld from public disclosure.

This section further

requiras the statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The information scught to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

o110200620 811001

gj

PDR ADOCK 05000416

O

PDR

S

fEof g

'

-

- - - - - - .

VF-

OCT 01E81

Mississippi Power and Light Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

M

R. C. Lewis, Director

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report No. 50-416/81-35

cc w/ encl:

D. C. Gibbs, Vice President

Middle South unergy, Inc.

C. K. McCoy, Plant Manager

bcc w/ encl:

NRC Resident Inspector

Dccument Manage' ent Branch

State of Mississippi

RI

RI

RII

RI

RII

t

RII

4lJohl son:aw

'{} blllW

f

LL .[e

o*A

I

n

A

PTBurnett

CEMurphy

FTaylor

RCL is

AGibson

09/2/'81

09/JfS1

09/J /81

09go/81

09/)g81

09/fi/81