ML20031F926
| ML20031F926 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 10/16/1981 |
| From: | PORTLAND GENERAL ELECTRIC CO. |
| To: | |
| Shared Package | |
| ML20031F919 | List: |
| References | |
| NUDOCS 8110200561 | |
| Download: ML20031F926 (1) | |
Text
.
Evne E
o 88 00 Sif TABIE 3.3-4
~
o
~3 ENGINEERED SAFL'IT FEA'IURE AC'IUATION SYSTEi4 INSTRtMENTATION TRIP SETIOINTS Y
o o o u s--
4
).gge {
FUNCTIONAL UNIT TRIP SETPOINT ALILWABLE VALUES C
1.
SAFE'1T INJECTION, 'IURBINE 'IRIP AND l
FEEDWATER ISOIATION 4
a.
Manual Initiation Not Applicable Not Applicable b.
Automatic Actuation Logic Not Applicable Not Applica1be c.
Containment Pressure--High 1 4 psig i 4.5 psig d.
Pressurizer Pressure--Im i 1765 psig i 1755 psig R
e.
Differential Pressure i 100 psi i 112 psi
{
Between Steam Lines-Iligh a
U f.
team Flow in '190 Steam Lines-1 A function defined as i A function defined as
]
High Coincident with T
-- W I N follows: 40% of full steam follows: 44% of full avg or Steam Line Pressure-Low flow between 0% and 20% load steam flow betweeen 0% and and then increasing linearly 20% load and then increasing to 110% of full steam flow linearly to 111.5% of full at full load full steam flow at full load i
Tavg 1 553*F Tavg 1551*F 4
> 600 psig steam line
> 580 psig steam line j
)
pressure pressure g
2 E
ii W
k 4
. --