Text

-

%

g

.

OCT 1 - 1981

Tennessee Valley Authority

ATTN: Mr. H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

_

_

Subject: Report Nos. 50-553/81-07

d 50-554/81-07

This refers to the routine safety inspection conducted by Mr. B. R. Crowley of

this office on September 21-23, 1981, of activities authorized by HRC Construc-

tion Permit Nos. CPPR-162 and CPPR-163 for the Phipps Bend facility and to the

discussion of our findings held with Mr. J. C. Cofield, Assistant Construction

Engineer, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed rcport will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your inten-

tion to file a request for withholding; and (b) submit within twenty-five days

from the date of this letter a written application to this office to withhold

st_a information. If your receipt of this letter has been delayed such that less

than seven days are available for your review, please notify this office promptly

so that a new due date may be established. Consistent with section 2.790(b)(1),

such application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part thereof sought to be withheld,

and a full statement of the reasons on the basis of which it is claimed that the

information should be withheld from public disclosure.

This section further

requires the statement to address with specificity the

siderations listed in

n

Ib/g

  • 'gdC[lWO

$ ocri o i n

2

' T k s. wu., ,,

B110200499 811001

$

"5

~

~

PDR ADOCK 05000553

'

'

G

PDR

<

Q, , s

[

-

(

t//

.

r

.

Tennessee Valley Authority

2

00T 1 - 1981

10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated

as far as possible into a sepe ate part of the affidavit. If we do not hear from

you in this regard within the specified periods noted above, the. report will be

placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

'

R. C. Lewi s, Directo*-

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report Nos.

50-553/81-07 and 50-554/81-07

cc w/ encl:

H. J. Green, Director of Nuclear Power

W. P. Kelleghan, Project Manager

J. F. Cox, Supervisor, Nuclear

Licensing Section

J.-E. Wills, Project Engineer

H. N. Culver, Chief, Nuclear

Safety Review Staff

bcc w/ encl:

Document Management Branch-

State of Tennessee

RIj

RII -

RII

RII

R

h

.

$

C14

BCro ley:aw

, brdt

CEMurphy

AFGib on

aylor

CLewis

09

/81

409/gC/81

09/y/81

09/p/81 -

/81

/61

~

Ili1