Text
-
%
g
.
OCT 1 - 1981
Tennessee Valley Authority
ATTN: Mr. H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
_
_
Subject: Report Nos. 50-553/81-07
d 50-554/81-07
This refers to the routine safety inspection conducted by Mr. B. R. Crowley of
this office on September 21-23, 1981, of activities authorized by HRC Construc-
tion Permit Nos. CPPR-162 and CPPR-163 for the Phipps Bend facility and to the
discussion of our findings held with Mr. J. C. Cofield, Assistant Construction
Engineer, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed rcport will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your inten-
tion to file a request for withholding; and (b) submit within twenty-five days
from the date of this letter a written application to this office to withhold
st_a information. If your receipt of this letter has been delayed such that less
than seven days are available for your review, please notify this office promptly
so that a new due date may be established. Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the
siderations listed in
n
Ib/g
- 'gdC[lWO
$ ocri o i n
2
' T k s. wu., ,,
B110200499 811001
$
"5
~
~
PDR ADOCK 05000553
'
'
G
<
Q, , s
[
-
(
t//
.
r
.
Tennessee Valley Authority
2
00T 1 - 1981
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a sepe ate part of the affidavit. If we do not hear from
you in this regard within the specified periods noted above, the. report will be
placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
'
R. C. Lewi s, Directo*-
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report Nos.
50-553/81-07 and 50-554/81-07
cc w/ encl:
H. J. Green, Director of Nuclear Power
W. P. Kelleghan, Project Manager
J. F. Cox, Supervisor, Nuclear
Licensing Section
J.-E. Wills, Project Engineer
H. N. Culver, Chief, Nuclear
Safety Review Staff
bcc w/ encl:
Document Management Branch-
State of Tennessee