SEP 10 198I Docket No. 99900330/81-01
~
//
O f /l Q }%
Westinghouse Electric Corporation M
OCIl S 1934 Switchgear Division ATTN: Mr. D. H. Sauter J
" ' %..., %,c" General Manager 700 Braddock Ave.
East Pittsburgh, PA 15112
'M
'O r
\\,/
Gentlemen:
NN 1 "'
This refers to the QA program conducted by Mr. W. H. McNeill, of this office.
on August 4-7, 1981, of your facility at East Pittsburgh, Pennsylvania, associated with the fabrication of switchgear assemblies and to the discussions of our findings with you and amnbers of your staff at the conclusion of the inspection.
This inspection was made to confirm that, in the areas inspected, your QA program is being effectively implemented. The inspection effort is not designed to assure that unique quality requirements imposed by a customer are being achieved; nor to assure that a specific product, component, or service provided by you to your customers is of acceptable quality. As you know, the NRC requires each of its licensees to assume full responsibility for the quality of specific products, components, or services procured from others. You should, therefore, not conclude that the NRC's inspection exempts you from inspections by an NRC licensee or his agents, nor from taking effective corrective action in response to their findings.
l Areas examined and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel and observations by the inspector.
During the inspection it was found that the implementation of your QA program failed to meet certain NRC requirements. The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.
Please provide us within 30 days from the date of this letter a written statement containing, (1) a description of steps that have been or will be taken to correct these items, (2) a description of steps that have been 1
or will be taken to prevent recurrence, and (3) the date your corrective i
actions and preventive measures were or will be completed. Consideration may be given to extending your response time for good cause shown.
8110200257 8109ip Th.
PDR GA999 EPfVWEST L'
99700330 PDR.
/sf orrc>..WP,U/CS P
', J I,B,.
.p.
,... I.E S.....
p.-JUy.....
S * ">)McNeil:.d
. lRo.t apovh.......JGagliardo...T 1.i ns...
. ~. -...
i 9g/81 9/d81.......d/M/81......
. 9/ \\. /81.......
i l.une ronu% no.soi uncu o24o OFFIC.I A L R ECORD COPY.
Westinghouse Electric Corporation 2
1 The responses dhected by this letter are not subject to the clearance pro-cedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, Pl.96-511.
In accordance with 10 CFR 2.790 of the Commiission's regulations, a copy of this letter and the enclosed inspection report, will be placed in the NRC's Public Document Room.
If this report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for withholding; and (b) sub-mit within 25 days from the date of this letter a written application to this 4
office to withhold such infonaation.
If your receipt of this letter has been delayed such that less than seven days are available for your review, please notify this office promptly so that a new due date may be established.
Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and Aich contains a full statemer.t i
of the reasons on the basis which it is claimed that the information should be withheld from public disclosure. Thi; section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The infonnation sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear frma you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.
i Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
i Sirnerely, j
U1 dis Potapovs, Chief Vendor Inspection Branch
Enclosures:
1.
Notice of Nonconformance 2.
Inspection Report No. 99900330/81-01 3.
Inspection Data Sheets pages 1 through 3 bec: