VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 81-08

[

FOR THE MONTH'0F-SEPTEMBER, 1981 4

i i

4 h

sito2oo2r/ stioo'9 N'

PDR ADOCK 05000271.

R PDR.

4 OPERATING DATA REPORT DOCKET NO. 50-271 DATE 811009 COMPLETED BY F.J. Burcer TELEPHONE (802)257-7711 Ext.1 OPERATING STATUS Notes

1. Unit Name:

Vermont Yankee

2. Reporting Period: Sentember
3. Licensed Thermal Power (MWt):

'.593

4. Nameplate Rating (Gross MWe):

540

5. Design Electrical Rating (Net MWe):514(oc) 504(cc)
6. Maximum Dependable Capacity (Gross MWe):

535

7. Maximum Dependable Capacity (Net MWe):

504

8. If Changes occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons:
9. Power Level to Which Restricted,If Any(Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr-to-Date Cumulative

11. Hours In Reporting Period 720.00 6,551.00
12. Number Of Hours Reactor Was Critical 720.00 6.518.12 64,053.90
13. Reactor Reserve Shutdown Hours 0.00 _

0.00 0.00

14. Hours Generator On-Line 720.00 6,460.05 62,061.63
15. Unit Reserve Shutdown Hours 0.00 0.00 n_nn
16. Gross Thermal Energy Generated (MWH) 1,079,485.00 9,940,435.00 88,543,952.00
17. Gross Electrical Energy Generated (MWH) 352,951.00 3.303.727.00 29.416.574.00
18. Net Electrical Energy Generated (FNH) 331,080.00 3.135.674_On

?7_RR7 9ss no

19. Unit Service Factor 100.00 98.61 78.43
20. Unit Availability Factor 100.00 98.61 78.41
21. Unit Capacity Factor (Using MDC Net) 91.24 94.97 69.91
22. Unit Capacity Factor (Using DER Net) 89.46 93.12 68.55
23. Unit Forced Outage Rate 0.00 1.39 6.73
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling outage scheduled to start October 17, 1981 _and continue for saven weeks.

?nwar cnneednun nenrred Sonrombor 1R_ 19R1 nr 0000 hv.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-271 UNIT Vermont Yankee

(

DATE 8110!)p 2'

COMPLETED BY F.J. Burger TELEPHONE (802)257-7711 Ext. 137 MONTH September DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL l

(MWe-Net)

(MWe-Net) 1.

486 17.

491 2.

486 18.

491 3.

487 19.

491 4.

487 20.

483 5.

262 21.

490 i

6.

331 22.

488

}

7.

329 23._

486 8.

432 24.

Ag6 9.

489 25.

484 10.

492 26.

353 11.

487 27.

451 12.

~

485 28.-

489

-13.

426 29(

485 14.

485 30.

485 15.

487 31.

16.

491 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

I i.

w, - -,

,,,.._,...m..

__,_,_,-,,4.

-,~-......,..

UNIT SliUTDOWNS AND POWER REDUCTIONS DOCKET No 50-271 UNIT NAME Vermont Yankee DA E 811009 REPORT MONTil September COMPLETED BY F.J. Burger TELEPHONE (802)257-7711 Ext. 13/

Eu s

em u

OI "c M O' License s

Eu ause & Conective No.

Date o

8.

%8 8

i ti 8 Event 38 8.

^i " '

N

$6 0

fi.E $ -

Report #

EO h"d 4

y*g a

81-15 810905 F

0 A

4 N/A HC llTEXCH Power reduction to investigate high (Power reactor vessel conductivity.

Reduct.]

81-16 810906 F

0 A

4 N/A l

CD VALVEX Power reduction to investigate steam (Power leak.

Reduct.:

kl0913 81-17 S

0 B

4 N/A HA TURBIN Power reduction for Main Turbine and

~'

(Power RB CONROD Control Rod Surveillance.

Reduct.

81-18 810926 S

0 B

4 N/A HA TURBIN Power reduction for Main Turbine and (Power RB CONROD Control Rod Surveillance.

Reduct.

F: Forced Reason:

Method:

Exhibit C-ItIstructions

.S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)

(NUREG 0161)

E-Operator Training & License Examination F-Administrative 5 Exhibit I - Same Source l

G-Operational Error.(Explain)

H-Other (Explain)

+

7/80

DOCKET NO.

50-271 UNIT Vermont Yankee DATE 811009

' COMPLETED BY F.J. Burger TELEP110NE (802)257-7711 Ext. 137 SAFETY RELATED MAINTENANCE NATURE OF MALFUNtiION ER OR OUTAGE EQUIPMENT MAINTENANCE NUMBER CAUSE RESULT CORRECTIVE ACTION Circuit Breaker for RRU-4 Corrective LER 81-23/3L RRU Motor Failure Breaker Burned Replaced Breaker.

MR 81-998 Up.

See LER For more Details.

"A" SBGT Filter Corrective N/A Filter Gasket Blow By Replaced Gasket.

MR 81-1020 I

Pinched During Installation After Normal Surveillanct "A" SBGT Charcoal Corrective N/A Unknown Indeterminate Replaced Charcoal.

MR 81-1022 Test Data Refueling Platform Signal /

Corrective N/A Broken Lead In Erratic Rod Repaired Cable.

. Power Cable MR 81-1043 Cable.

Blocks.

RCIC Turbine Controller Corrective N/A liigh Speed Limiter liigh Speed Con-Recalibrated Controller.

MR 81-1050 Set Point Drift.

trol Uncertain, But Able to Satisfy Tech.

Spec. and ISI Requirements.

PCIS Relay 16A-K7B Corrective N/A Burned Coil Failed Relay.

Rebuilt Relay.

MR 81-1054 s

d DOCKET NO.

~

UNIT Vermont Yankee DATE 811009 COMPLETED BY F.J. Burger TELEPHONE (802)257-7711 Ext. 137 REPORT MONTH September

SUMMARY

OF 0?ERATING EXPERIENCES Highlights Vermont Yankee operated at 94.1% of rated thermal power for the month.

Gross electrical generation was352,951 MWH or 90. 7% of design electrical capacity.

Operating Summary The following is a chronological description of plant operations including other pertinent items of int ~erest for the month:

9/1/01 At the beginning of the reporting period the plant was operating at 99.7% of rated thermal power.

9/5/81 At 0300 hrs. a power reduction was initiated to investigate high

~

[

reactor vessel conductiv,ity.

9/5/81 At 2300 hrs. a return to full power was initiated.

9/6/81 At 1630 hrs. a power reduction,was initiated to invetigate a steam leak.

9/6/81 At 2350 hrs. a return to full power was initiated.

9/13/81 At 0000 hrs. a power reduction was initiated for main turbine and control rod surveillance.

q 9/13/81 At 0330 hrs. a return to full power was initiated.

9/18/81 At 0000 hrs. commenced power coastdown.

9/26/81 At 0000 hrs. a power reduction-was initiated for main turbine and control rod surveillance.

9/26/81 At 0430 a return to full power was initiated.

9/30/81 At the end of the reporting period the plant was operating at 97.4% of rated thermal power.

- - - - -