ML20031F303
| ML20031F303 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 09/29/1981 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Crouse R TOLEDO EDISON CO. |
| Shared Package | |
| ML20031F304 | List: |
| References | |
| NUDOCS 8110190512 | |
| Download: ML20031F303 (2) | |
See also: IR 05000346/1981015
Text
-
_ _ _ _ _ _ _ .
.
.
.
SEP 2 9 1981
/ k h tIrg
?
~ 's
,
Docket No. 50-346
0CT161981> ip'
Toledo Edison Company
,
_
,,
ATTN: Mr. Richard P. Crouse
g*mluse
9
~
Vice President
/
Nuclear
/
C"
/
Edison Plaza
g
300 Mt>
nn Avenue
Toledg
43652
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. L. A. Reyes
and W. G. Rogern, of this office on the August 3-7, 10-14, 17-21, 24-28, and 31,
1981, of activities at Davis-Besse Nuclear Power Station, Unit I authorized by
NRC Operating License No. NPF-3 and to the discussion of our findings with
Mr. T. Murray at the conclusion of the inspection.
The euclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements we*e identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any infctmation that you er
your contractors believe to be exempt from disclosure ander 10 CFR 9.5 h)(4),
it is necessary that you (a) notify this office by telephone within sever (7)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days froa the date of
this letter a written application to this office to withhold such infor-
mation.
Section 2.790(b)(1) requires that any such application must be
-accompanied by an affidavit executed by the owner of the information which
identifies the document or part sought to be withheld, and which contains
fEP '
s
/
/
-
jl8110190512810929
DR ADOCK 05000346
- _ - _ _ _ - - _ _ . -
e-
-
,
'
.
.
.
Toledo Fdison Company
-2-
TSEP 2 9 1981
a full stater.eut of the reasons which are the bases for the claim that the
information should be withheld from public disclosure. This section further
requires t*1e statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-
porated as far as posaible into a separate part of the affidavit.
If we do
not hear from you in this regard within the specified periods noted above, a
copy of this letter and the enclosed inspection report will be placed in the
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
R. L. Spessard, Director
,
Division of Resident and
Project Inspection
Enclosure:
IE Inspection
Report Nc 50-346/81-15
cc w/ enc 1:
T. D. Murray, Station
Superintendent
DMB/ Document Control Dess (RIDS)
Resident Inspector, RIII
Harold W. Kohn, Power
Siting Commission
Helen W. Evans, State of Ohio
- l
l
RIII
RIII
RIII
RIII
RII
%-
%
5 w/so
c15%es
..
Rogers
Re
McGregor
Streeter
Sp ssard
9/g/81
%
1/
Ghi
3
- - - .
-
- . - .
-- - - -
. - . -
--
.
- -
-
- - . -