ML20031F303

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-346/81-15 During Aug 1981.No Noncompliance Noted
ML20031F303
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/29/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20031F304 List:
References
NUDOCS 8110190512
Download: ML20031F303 (2)


See also: IR 05000346/1981015

Text

-

_ _ _ _ _ _ _ .

.

.

.

SEP 2 9 1981

/ k h tIrg

?

~ 's

,

Docket No. 50-346

0CT161981> ip'

Toledo Edison Company

,

_

,,

ATTN: Mr. Richard P. Crouse

g*mluse

9

~

Vice President

/

Nuclear

/

C"

/

Edison Plaza

g

300 Mt>

nn Avenue

Toledg

43652

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. L. A. Reyes

and W. G. Rogern, of this office on the August 3-7, 10-14, 17-21, 24-28, and 31,

1981, of activities at Davis-Besse Nuclear Power Station, Unit I authorized by

NRC Operating License No. NPF-3 and to the discussion of our findings with

Mr. T. Murray at the conclusion of the inspection.

The euclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements we*e identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any infctmation that you er

your contractors believe to be exempt from disclosure ander 10 CFR 9.5 h)(4),

it is necessary that you (a) notify this office by telephone within sever (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days froa the date of

this letter a written application to this office to withhold such infor-

mation.

Section 2.790(b)(1) requires that any such application must be

-accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

fEP '

s

/

/

-

jl8110190512810929

DR ADOCK 05000346

PDR

- _ - _ _ _ - - _ _ . -

e-

-

,

'

.

.

.

Toledo Fdison Company

-2-

TSEP 2 9 1981

a full stater.eut of the reasons which are the bases for the claim that the

information should be withheld from public disclosure. This section further

requires t*1e statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-

porated as far as posaible into a separate part of the affidavit.

If we do

not hear from you in this regard within the specified periods noted above, a

copy of this letter and the enclosed inspection report will be placed in the

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

R. L. Spessard, Director

,

Division of Resident and

Project Inspection

Enclosure:

IE Inspection

Report Nc 50-346/81-15

cc w/ enc 1:

T. D. Murray, Station

Superintendent

DMB/ Document Control Dess (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Power

Siting Commission

Helen W. Evans, State of Ohio

l

l

RIII

RIII

RIII

RIII

RII

%-

%

5 w/so

c15%es

..

Rogers

Re

McGregor

Streeter

Sp ssard

9/g/81

%

1/

Ghi

3

- - - .

-

- . - .

-- - - -

. - . -

--

.

- -

-

- - . -