Forwards IE Insp Repts 50-440/81-13 & 50-441/81-13 on 810902-04.No Noncompliance Noted
ML20031F260
Person / Time
Site: Perry  
Issue date: 10/05/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20031F261 List:
References
NUDOCS 8110190446
Download: ML20031F260 (2)


See also: IR 05000440/1981013

Text

._

_

6

.

.

.

'OCT

5 1981

NYld csh

87) rf H .I N

Docket No. 50-440

\\

d

Docket No. 50-441

4 fil t' Q' D 4

The Cleveland Electric Illuminating

d'l

'

Company

.

OCT161981

th j-

ATTN: Dalwyn R. Davidson

C u.s.eucuu nauuuom

Vice President - System

9'

Engineering and Construction

k

&

Post Office Box 5000

4r

'

Cleveland, OH 44101

m

Gentlemen:

This refers to the routine safety inspection conducted by Mr. I. T. Yin

of this office on September 2-4, 1981, of activities at Perry Nuclear

Power Plant, Units 1 and 2, authorized by NRC Construction Permit No.

CPPR-148 and No. CPPR-149 and to the discussion of our findings with

Mr. M. R. Edelman and others of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

1h items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 cf the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document' Room. If this report contains any information that you or

-your contractors believe to be excmpt from disclosure under 10 CFR 9.5(a)(4),

it.is necessary that you (a) notify this office by telephone within seven (7)

days'from the date of this letter of your intention to file a request for.

withholding; and (b) submit within twenty-five (25) days from the date of

'thir letter a written application to this office to withhold such infor-

~

mation. Section 2.790(b)(1) requires that any such application must be

$Ql

$

I I

48110190446 8?1005

,PDR ADOCK 05000440

G

pg.

.

4

e

.

The Cleveland Electric Illuminiating - 2 -

SCT

6 1981

Company

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the reascas on the basis which it is claimed that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

,

incorporated as far as posrible into a separate part of the affidavit.

If

we do not hear from you in this regard within the spe.:ified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this insiection.

Sincerely,

sisc.e..w W .L

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

Enclosure:

IE Inspection

Report No. 50-440/81-13

and No. 50-441/81-13

cc w/ encl:

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Power

Siting Commission

Daniel D. Wilt, Attorney

Helen W. Evans, State of Ohio

i

T

""' /

"'j';p

gMme-

"jj'</fv 'zb

Yin /j.

Danielson

Norelius

g),//fa,n s

  • !'%*)

9/w/rf

  • I 'If

Icfl11

iojp/9L

-

- - -

- -

-

-

-

-

- - -

-