Fliling Addras Alabama Power Company 600 North 18th Streat Post Office Box 2641 B;rmmgham, Alabama 35291 Telephone 205 783d81 F. L. Clayton, Jr.
%"O* 2;"l"'
Wabama Power rne souwn ewinc system October 12, 1981 N
Docket No. 50-364 S
{Fjp /
JLJ s
E OCTI 6198td Director of Nuclear Reactor Regulation
' II U. S. Nuclear Regulatory Commission
~~
.a, %
u mas %sai C Washington, D. C. 20555 y
/c' Attention:
Mr. S. A. Varga g
l m#
RE: Temporary Change to Operating Licens No. NPF-8 Technical Specifications Gentlemen:
While performing roc +.ine preventive maintenance under the direction of Colt Industries on Diesel generator 1-2A, it was determined that the engine driven jacket water pump bearing needed tc be replaced due 1.0 failure. A new bearing was obtained from the plant storcroom, cooled with liquid nitrogen and installed in the bearing bore contained in the pump support.
During reassembly, the inside diameter of the bearing was found to be 0.007 inchas undersized. The bearing was pressed from the bearing housing and a dimensional check indicated that the bearing housing inside ditmeter was 0.007 undersized. A new bearing housing with the proper bearing bore dimensions was obtained from the plant storeroom.
While installing the bearing (cooled wich liquid nitrogen), it was dropped into the bearing bore causing the bearing to crack. No additional spare bearings were available onsite.
Currently, spare bearings are in route scheduled to arrive at the plant at 5:30 P.M. on October 12, 1981. Colt Industries has estimated an interval of 48-72 hours to install the bearing, reassemble the pump, and perform operability tests. The completion of repairs will extend past 11:31 P.M. on October 12, 1981, wnich is the deadline for the L.C.0.
under which the preventive maintenance was being cerformed.
Currently with Farley Unit 1 shutdewn for major repairs to the turbine generator, Alabama Power Company, as a nember of the Southern Company Power Pool, is a net purchaser of both capacity and energy during the fourth quarter of 1981. Major maintenance on other generating units is being conducted during this period. The shutdown of Unit 2 to complete this l
repair would further exacerbate this condition of purchasing power and/or delaying necessary maintenance on other units in preparation for winter load requirements.
$g 6cYkW
\\
g9 4
gs%
'8110190419 811012 PDR ADOCK 05000364
.P PDR
U.S. Nuclear Regulatory Commission Page 2 October 12, 1981 Washington, D.C.
20555 Alabama Power Company requests a one-time extension of the L.C.0.
from 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to six days as indicated in Attachment 1.
It is the judgment of Alabama Power Company, as outlined in Attachment 2, that the reliability of the offsite and onsite AC power sources,i:nder all conditions, is sufficient to allow this extension with no adverse affects to the safe operation of Farley Unit 2.
Approval of this extension is requested by 5:00 P.M. on October 12, 1981, in order that the generation of Unit 2 nc t be impacted.
Alabama Power Company's Plant Operations Review Committee has reviewed this proposed change to the Technical Specifications and has determined that such changes do not involve an unreviewed safety question.
The Nuclear Operations Review Board is scheduled to review this change by -
October 13, 1981.
The class of each item in this proposed amendment is designated as Class III for Unit 2 according to 10CFR170.22 requirements.
Enclosed 1s a check for $4,000 to cover the total amount of fees required.
In accordance with 10CFR50.30(c)(1)(i), three signed originals and thirty-seven (37) additional copies of these proposed changes are enclosed.
If you have any questions, please advise.
Yours ver{ rul,
'\\,,F. L. Clayton, Jr.
FLCJr:RLG:aw Attachments SWORN TO Ap SUBSCRIBED BEFORE ME THIS fg & DAY OF OC;G,&A, xc: Mr. J. P. O'Reilly 1981.
Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. E. A. Reeves
,A j
Mr. L. L. Kintner
.G
/
Mr. W. H. Bradford p
Notary Public
'/_
My Comission Expires:
b 23
. _ _