__
.
SEP 2 9 19W
Ob
$
-\\ p
.
9
Docket No. 50-409
9
,
Dairyland Power Cooperative
.(H.i t)CT16 MWi
'
g588
ATTN: Mr. F. W. Linder
'
General Manager
N ,,,
p
2615 East Avenue - South
9
La Crosse, WI 54601
,
.
f
m
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. W. L. Forney
and M. W. Branch of this office on August 1~31., 1981, of activities at La Crosse
Boiling Water Reactor authorized by NRC Opern ing License No. DPR-45 and to the
discussion of our findings with Mr. R. Shimshak and others at the conclusion of
the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor-
matien. Section 2.790(b)(1) requires that any such application must be
acccmpanied by an affidavit executed by the owner of the information which
identifies the document or'part sought to be withheld, and which contains
a full statement of the reasons which are the bases for the claim that the
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-
porated as far as possible into a separate part of the affidavit.
If we do
s
/ /
-
0.
O
. _
-
. , - .
. .-- - . - .
. - _
-
. . . . - _ . . - - - - . - _ _ _ _ -
.._,
. -
.
4
.
,
Dairyland Power Cooperative
-2-
S E P ? , .o ol:
f
-
,
not hear from you in this regard within the specified periods noted above, a
copy of this letter and the enclosed inspection report will be placed in the
.
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Siacerely,
l
l
'
IM
t
R. L. Spessard, Director
Division of Resident and Project
Inspection
'
Enclosure:
IE Inspection
Report No. 50-409/81-16
cc w/ enc 1:
R. E. Shimshak, Plant
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Inspector
,
i
Stanley York, Chairman
Public-Service Commission
i
!
1
,
i-
4
.
i
l
RIII
RIII
RIII
RIII
-
6Y
o
so'
M Gyegor
Str etpr
Spe
rd
'?,2693
9/)f/81
g
9/28/81
/
-
-
- -
. .
-