Forwards IE Insp Rept 50-409/81-16 During Aug 1981.No Noncompliance Noted
ML20031F244
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 09/29/1981
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Linder F
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20031F245 List:
References
NUDOCS 8110190414
Download: ML20031F244 (2)


See also: IR 05000409/1981016

Text

,

__

.

SEP 2 9 19W

Ob

$

-\\ p

.

9

Docket No. 50-409

9

,

Dairyland Power Cooperative

.(H.i t)CT16 MWi

'

g588

ATTN: Mr. F. W. Linder

'

General Manager

N ,,,

p

2615 East Avenue - South

9

La Crosse, WI 54601

,

.

f

m

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. W. L. Forney

and M. W. Branch of this office on August 1~31., 1981, of activities at La Crosse

Boiling Water Reactor authorized by NRC Opern ing License No. DPR-45 and to the

discussion of our findings with Mr. R. Shimshak and others at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

matien. Section 2.790(b)(1) requires that any such application must be

acccmpanied by an affidavit executed by the owner of the information which

identifies the document or'part sought to be withheld, and which contains

a full statement of the reasons which are the bases for the claim that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-

porated as far as possible into a separate part of the affidavit.

If we do

s

/ /

-

0.

O

PDR

. _

-

. , - .

. .-- - . - .

. - _

-

. . . . - _ . . - - - - . - _ _ _ _ -

.._,

. -

.

4

.

,

Dairyland Power Cooperative

-2-

S E P ? , .o ol:

f

-

,

not hear from you in this regard within the specified periods noted above, a

copy of this letter and the enclosed inspection report will be placed in the

.

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Siacerely,

l

l

'

IM

t

R. L. Spessard, Director

Division of Resident and Project

Inspection

'

Enclosure:

IE Inspection

Report No. 50-409/81-16

cc w/ enc 1:

R. E. Shimshak, Plant

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

John J. Duffy, Chief

Boiler Inspector

,

i

Stanley York, Chairman

Public-Service Commission

i

!

1

,

i-

4

.

i

l

RIII

RIII

RIII

RIII

-

6Y

o

so'

M Gyegor

Str etpr

Spe

rd

'?,2693

9/)f/81

g

9/28/81

/

-

-

- -

. .

-