ML20031F158

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-456/81-11 & 50-457/81-11 on 810916-18.No Noncompliance Noted
ML20031F158
Person / Time
Site: Braidwood  
Issue date: 10/05/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20031F159 List:
References
NUDOCS 8110190278
Download: ML20031F158 (2)


See also: IR 05000456/1981011

Text

_ _ - _ _ _ _

- _

_ _ _

_

.

.__

m ._

.

..

OCT

5 test,

SW

o>

Docket No. 50-456

3

p

Docket No. 50-457

g

Commonwealth Edison Company

f, OCT2 6 N*I

'

ATTN: Mr. Cordell Reed

M

JJ

hy

cd@roer ,q

'

"

Vice President

Post Office Box 767

\\

,<g

Chicago, IL' 60690

i

gl,Q1

s

Gentlemen:

<

This refers to the routine safety inspection conducted by Messrs.

1

R. N. Gardner and R. L. Lee of this office on September 16-18, 1981, of

i

activities at Braidwood Station, Units 1 and 2, authorized by NRC Con-

struction Permits No. CPPR-132 and No. CPPR-133 and to the discussion of

our findings with Mr. R. Cosaro and others of your staff at the conclus'an

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be-placed in the NRC's-

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

!

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons which are the bases for the claim that the

information should be withheld from public disclosure. This section^further

C6of

-

s

//

RM H8iPotM8& ,

t

D

PDR

.

,

,

.

.

.

.

..

-.-

.

'4 o

.

m

- -

-- -

_

. ..

- ..

_.

. _ _ _ - _ - . - _ _ - _ . __

_

.

. __.

.

-

.

Commonwealth rdison Company

-2-

OCT

5 091

f

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incor-

porated as far as possible into a separate part of the affidavit.

If we do

not hear from you in this regard within the specified periods noted above, a

copy of this letter and the enclosed inspection report will be placed in the

Public Document Room.

We will gladly discuss any questions you have'concerning this inspection.

Sincerely,

pQgtpaNSISWd II Ed*

t

,

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

4

Enclosure:

IE Inspection

Reports No. 50-456/81-11

and No. 50-457/81-11

cc w/ encl:

Louis 0. De1 George

1

Director of Nuclear

Licensing

R. Cosaro, Project

Superintendent

V. I. Schlosser,

Project Manager

J. F. Gudac, Station

Superintenelent

i

DMB/ Document Control Desk (RIDS)

Mary Jo Murray, Office of

Assistant Attorney General

l

l

l

l

l

4

7

< .RIII

RLfl

RIf

RIII.

RII

RIII

IJ

'

&

I

jggh? >

/.

G

'

s

Gar ner/so

Lee

HaWkins

Wihliams

Hay d

Nei ler

Norelius

'

,

9/28 81

,e

7/g 4gf

'

.

,

,

4

'/;

,