s itz n
8 UNITED STATES
[
pii NUCLEAR REGULATORY COMMISSION
-E
%.v/p;/
WASHINGTON. D. C. 20656 4
s ALABAMA POWER COMPANY DOCKET NO 50-364 JOSEPH M. FARLEY NUCLEAR PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE l
Amendment No. 8 License No. NPF-8 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The request for amendment by Alabama Power Company (the licensee) dated September 28, 1981, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amer.dment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance m t.L 0 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
- 8110190248 811001 PDR ADOCK 05000364
.p PDR
. 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to th'is license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-8 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 8',are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Speci fications.
3.
This license amendment was effective September 22, 1981.
FgTHENUC R n GULATORY COMMISSION
___1L--
I teven K.
arga, hi f
Operating eactors r inch #1 Division of Licensi
Attachment:
Changes to the Technical Specifications Date of Issuance: October 1,1981 1
C
ATTACHMENT TO LICENSE AMENDMENT AMENDf1ENT NO.
8 TO FACILITY OPERATING LICENSE NO. NPF-8 DOCKET NO. 50-364 i
Revise Appendix A as follows:
Remove Pages Insert Pages 3/48-1 3/4 8-1 3/4 8-2 3/4 8-2 3/4 8-3 3/4 8-3 3/4 8-4 3/4 8-4 f
I h
i
.~.y e--
+-twr - * - - '
ww-~**""Ft-'~'**"-
3/4.8.1 A.C. SOURCES 0?EE TING LIMITING C:NDITION FOR OPERATION 1
3.8.1.1 As a minicum, tha folicwing A.C. electrical pewar sourcas shall ha
??E?.43LE:
Two physically i$ dependant circuits batween tha offsita transmissica a.
network to tha switchyard and two physically inds;andant circuits frca the switchyard to the casite Class lE distribution systac, and b.
Two separate and independant diesal ganarater sets (Set A:
DG 1-2A and CG-1C, Set 3:
DG-23 and DG-20) each with:
1.
Separata day tanks containing a mini =um velu:n of S00 g'allens of fuel for tha 4075 kw diesal ganarators and 700 galicas of fuel fcr the 2250 kw diasal ganarator.
2.
A separate fuel transfer pu p for each diesal.
c.
A fuel storaga system censisting of fcur, independant storage tanks'each containing a minicum of 25,000 gallens of fuel."
APPLICA3ILITY:
h:0DE2 1, 2, 3 and 4.
ACTICN:
a.
With an offsite circuit incperabla, deconstrate tha OPERA 5ILITY cf the remaining A.C. sources by par. forcing Surveillance Require.. ants 4.8.1.1.1.a and 4.8.1:1.2.a.4 within one hour and at least once par 8***
hours thereafter res' tore at least two offsita circuits to 0?E.3ABLE A
status within 72 $ours or be in at legst HOT STAN05Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />'and in. COLD SHUTOOWN within the folicwing.20 hcurs.
b.
With one diesel generator set ineparable, den:nstrate.the epa: ability of the remaining A.C. sources by perfer..ing Survaillance Requirecants 4.8.1.1.1.a and 4.8.1.1.2.a.4 within one hour and at least once per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />'s7 hereafter.
Restore both diesel ganerator sets'tc 0?ERAELE status within 72'Ecurs or cceply with tha folicwing:
1)
B'e in at least HOT STAND 3Y within the next 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> and in COLD SHUTDOWN within the folicwing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
-One inoperacle. fuel storage tank is equivalent to one inoperable diesai cenerator set.
l
- 0ne time cnly exception for repair of Diesal 2 C - the'72 hcur actica statement for operability of Diesel 2.C may be extended to a period of 17 days provided Dies 612C is returned to OPERABLE status as soon as main'.enance is completed.
Yhe provisons of specification 3.0.4 are not applicable for tnis one time change.
- Cne ti=a only exception during repair of Diesel 2C - the 5 hcur interval test is extended to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
F*RLEY-UNIT 2 3/4 S-1 Agggcng;7 xa, ggg7 8
n 2)
One diesel generatcr set cay be made inoperable for up to 14 days to pet-form scheduled caintenance End tasting en dissal generat:rs 1C (or 2C) providad all the follcwin'g are satisfied:
a)
Unit 1 is in F00E 5 or 6 and appr:priata technical specif~ca-
.tiens.cevering the diesel generator sats are satisfied.
/
b)
The re:aining' Unit 2 diasel ganarators 1-2A., 23. IC (or 20) are OPERA 3LE.
c)
The service water systaa is recirculated to the p:nd and survaillanca requiracant 4.7.5.2.1 is varified prier to removing IC (or 2C) frem service and enca car S hours thereafter.
~
d)
Diesel Generator IC (or 2C) is raturned to CPERA3tE status
- as soon as =aintenanca is.cc: plated.
Otherwise, be in at least HOT STn:D3Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and.in COLD SH;.TCOWN within the folicwing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
c.
With one offsite circuit and one diesel generater set of the above required A.C. electrical pcwar sources inoparabia, dasonstrata the OPERASILITY of the recaining A.C. sources by perfer=ing Surveillance Requirements 4.8,h.T.l.a and 4.8.1.1.2.a.4 within ena hcur and at l
least once per 8" urs thereafter; restore at least ena of tha inoparable scurces to OPERASLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at.
least HOT STANDSY within the next 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> and in C01.0 SHUTDOWN within the folicwing 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
Restore at least two offsite circuits and both diesel generator sets to OPERAILE status within 72" hours frca the time of initial loss or be in at least HOT STA!!CEY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the follcwing 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br />.
d.
With two of the above recuired offsite A.C. circuits ineparable,
'a :enstrate the OPERA 3ILITY of both diesel generator sets by parforming Surveillance Requiramant 4.8.1.1.2.a.? within ene h:ur and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thareafter, unless the diesel generators are airaady operating; restore at leas ena of the incperable offsite 'ources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be s
in at least HOT STAND 5Y within the' next 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />. With caly cna offsite source restored, restore both offsite circuits to 0?ERAELE status within 72 hcurs from time of initial less or be in at least l
HOT STAi!D3Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD. 5HUTCOWN within l
the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
"One time only exception for repair of Diesel 2C - the 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> acticn statar.ent for operability of Diesel 2C may be extended to a period of 17 days provided Diesel 2C is returned to OPERAELE status as soon as maintenance is completed.
The provisions of specification 3.0.4 are not apolicable for this one time chance.
"'One tima only except; ion during repair of Diesal 2C - the 3 hcur intarval test is extended to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
FARLEY-UtilT 2.
3/4 8-2
. AP.EUD.MEiT : 0. f5 4 7, 8
ELEC'TRICAL PC'r:ER SYSTEf*1
- CTTCM:
(Centinued) e.
111th both of the above required diesel generator sets inc;erable, de:cnstrate the OPERA 3ILITY of two offsite A..C. circuits )y perfor=ing krveillance Recuirerent 4.8.1.1.1.a within I hour and at least once per S hours *thereafter; restore at least one of the incperable diesel generator sets to OPE?ASLE status within.2 hcurs**-*
or be in at least HOT STAND 5Y within the next 5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> and in COLD j
SMUT 00:.W within the follcwing 30. hours.
Restore both diesel'-
generator sets to GPERA3LE status within 72' hours'from tica) initial loss or be in least HOT STANC5Y within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD 590TD0'..3 within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
5*.*:.YEILLANCE RECUIREFENTS
".2.1.1.1 Each of the above required independeat circuits between t e offsite transmissien netwcrk and the onsite Class 1E distributica system shall be:
a.
Determined OPEFA3LE at least once per 7 days by verifying ccrrect breaker aligncants, indicated power availability, and b.
De=cnstrated 0?E?ASLE at least once per IS =enths during shutdewn by transferring unit pcuer supply from the normal circuit to the alternate circuit.
4.8.1.1.2 Each ciesel generator shall be demonstrated OPERA 5LE:
s a.
In accordance with the frequency specified in Table 4.3-1 on a STAGGERED TEST EASIS by:
1.
Verifying the fuel level in the day tank,.
2.
Verifying the fuel level in the fuel, storage tanks, 3.'
Verifying the fuel transfer pump can be stitrted and transfers fut! frem the s:crage syst,em to the day taak, Verif ing the diesel starts from ambient condition and 4.
f accelerates to at least 500 rpm, for the 2350 'ci generator ai.d 514 rpm for the 4075 kw generators, in less than or ecual to 10 seconds.
The generator voltage and frequency shall be 13552 volts and 2: 57 Hz within 10 seconds after the starc signal.
5.
Verifying the generator is synchronized, loaded to greater than or equal to its continuous rating, and operates for greater than or equal 60 minutes,
- - One time only exception for repair of Diesel 2C - 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement for operability of Diesel 2C may be extended to a period of 17 days provided Diesel 2C is returned to OPEPABLE status as soon as maintenance is completed.
The provisions of specification 3.0.4 are not applicable for this one time change.
- - One time only exception during repair of Diesel 2C - the 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> interval test is extended to 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
- - One time only exception for renair of Diesel 1C durina the current refuelina outage of Unit 1 - the 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 5ction statement for operability of the dieseT set which contains Diesel IC may be extended to a perica of 8 days (coincident with the return to operable status of Diesel IC as provided in Section 3.8.1.1.b.2) of Unit 2 Technical Specifications.) The provisions of specification 3.0.4 are not applicable for this one time change.
FARLEY-UNIT 2 3/4 8-3 AMENDMENT NO. 7, 8
~-
ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) 6.
Verifying the diesel generator is aligned t.o provide standby power to the associated emergency busses.
b.
At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank obtained in accordance with ASTH-0270-65, is within the acceptable limits specified in Table 1 of ASTM D975-74 when checked for viscosity, water and sediment, At least once per 18 months by:
c.
1.
Subjecting the diesel to an inspection in accordance with procedures prepareo in conjunction with its manufacturer's recommendations for this class of standby service, 2.
Verifying the capability to reject a load of greater than or equal to the largest single load associa*,ed with that diesel generator, while maintaining voltage between 3120 and 4910 volts and speed less than or equal to 75% of the difference between nominal speed and the overspeed trip setpoint and verifying recovery to 4160 420 volts and 60 1.2 Hz within 2 seconds.
3.
Verifying the generator capability to reject a load equal to its continuous rating without tripping..The generator voltage shall not exceed 120% during and following the load rejection.
4.
Simulating a loss or' offsite power by itself, and:
C Verifying de energization of the emergency' busses and load shedding frr.,a the emergency busses.
b)
Verifying the diesel starts on the auto start signal, energizes the emergency busses with permanently connected l
loads within 10 seconds, energizes the auto-connected l
shutdown loads through the load sequencer and operates for greater than or equal to 5 minutes while its generator is loaded with the shutdown loads.
After anergization of all loads, the steady state voltage and frequency of the emer-gency busses shall be maintained at 4160 + 420 volts and 60 ?,1.2 Hz during this test.
5.
Verifying that on an Safety Injection test si,nal (without ' loss of offsite power) the diesel generator starts on the auto start signal and operates on standby for greater than or equal to 5 minutes.
The generator voltage and frequency shall be
> 3952 volts and > 57 Hz within 10 seconds af ter the aute-start signal; the steady state generator voltage and frequency shall be maintained between 4160 t 420 volts and 60 1.2 Hz during this test.
FARLEY-UNIT 2 3/4 8-4 dmendment No. 8
' ~ ' ~
' ^ "