Forwards IE Insp Repts 50-327/81-23 & 50-328/81-28 on 810506-0705,notices of Violation & Deviation
ML20031E899
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/26/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20031E886 List:
References
NUDOCS 8110160531
Download: ML20031E899 (2)


See also: IR 05000327/1981023

Text

. _ _ _ _ _ _ -

_ _ . .

- - - _

_.

_

_ -__ _.

_

,, .

.

Ydibw

AUG 2 61981

,

Tennessee Valley Authority

ATTN: Mr. H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

l

Subject: Report Nos. N21/81-2Dhd 50-328/81-28

This refers to the routine safety inspection conducted by Mr. E. J. Ford of this

office on !!ay 6 - July 5,1981, of activities authorized by NRC License No.

DPR-77 and Construction Permit No. CPPR-73 for the Sequoyah facility.

Our

preliminary findings were discussed with Mr. J. M. McGriff, Assistant Plant

Superintendent, at the conclusion of the inspection.

Areas examined during the inspection and our finding . are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

'

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your respense are delineated in

!

Appendix A.

l

During the inspection it was found that certain activities under your license

t

!

appeared to deviate from Appendix B and have safety significance. This item

identified in the Notice of Deviation enclosed herewith as Appendix B.

Please

j

provide us in writing within 25 days of your receipt of this letter your comments

i

including a description of corrective actions that have been or will be taken,

corrective actions which will be taken to avoid further deviations, and the date

your corrective actions were or will be completed.

We have examined actions you have taken with regard to previously identified

enforcement matten and unresolved items. The status of these items is discussed

l

in the enclosed report.

i

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

l

,

'

In accordance with 10 CFR 2.',4 of the Commission's regulations, a copy of this

'

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

t

i

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been delayed such

8110160531 811o07

gDRADOCK 050003E7

PDR

_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_

e

'

AUG 2 61981

.

Tennessee Valley Authority

2

,

that less than seven days are available for your review, please notify this

office promptly)so that a new due date may be established. Consistent with

section 2.790(b (1), such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is claimed that the information should be withheld from public

disclosure. This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4).

The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted abave, the report will be placed in the Public Document

Room.

l

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

SS

R. C. Lewis, Director

Division of Resident and

Reactor Project Inspection

Enclosures:

1.

Appendix A, Notive of Violation

2.

Appendix B, Nccive of Deviation

3.

Inspection Report Nos. 50-327/81-23

and 50-328/81-28

cc w/ enc 1:

H. J. Green, Director of Nuclear Power

G. G. Stack, Project fianager

J. ft. Ballentine, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

H. N. Culver, Chief, Nuclear Safety

Review Staff

bcc w/ encl:

Resident Inspector

Document Management Branch

State of Tennessee

EQ9p

/)

R

RII'

RII

1

RC_lenjak

RClehis

Y )/$/

&uidk

EFord:dt

DQ

r

8/11/BJ

6/7

hiu

ad_ h ________