ML20031E890

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-395/81-25 on 810901-03.No Noncompliance Noted
ML20031E890
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 09/18/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20031E891 List:
References
NUDOCS 8110160522
Download: ML20031E890 (2)


See also: IR 05000395/1981025

Text

r

,

,

YELLOW

SEP 1819g;

-

.

C

s' 'ofpFl/s

.

L

j";. F}

'

-

South Carolina Electric and Gas Company

IILI

i

-

c

ATTN: Mr. T. C. Nichols, Jr. , Vice President

-

Power Production and System Operations

DCT 151981

P. O. Box 764

1 u 8 gyy=v - di

Columbia, SC 29218

Gentlemen:

\\'

Subject: Report No. 50-395/81-25

This refers to the routine safety inspection conducted by D. M. Montgomery of

this office on September 1-3, 1981, of activities authorized by NRC Construction

Permit No. CPPR-94 for the V. C. Summer Nuclear Plant facilitu and to the discus-

sion of our findings held with Mr. O. S. Bradham, Plant Manager, at the conclu-

sion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection tensisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from dis-

closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office

by telephone within ten days from the date of this letter of your intention to

file a request for withholding; and (b) submit within twenty-five days from the

date of this letter a written application to this office to withhold such infor-

mation.

If your receipt of this letter has been delayed such that less than

seven days are available for your review, please notify this office promptly so

that a new due date may be established.

Consistent with section 2.790(b)(1),

such application must be accompanied by an affidavit executed by the owner of the

information which identifies the document or part thereof sought to be withheld,

and a full statement of the reasons on the basis of which it is claimed that the

information should be withheld from public disclosure.

This section further

requires the statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit. If we do not hear from

you in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

!

y @s

/

/

WWR*aW4k

G

$[O l

/

.

.

SEP 181961

' South Carolina Electric and

2

'

Gas Company

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

/s/

Paul J. Kellogg, Chief

Reactor Projects Branch 2

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report No. 50-395/81-25

cc w/ encl:

J. B. Knotts, Jr.

O. S. Bradham, Station Manager

J. P. Harrison, Manager Nuclear

Security

C. A. Price, Manager, Nuclear

Enginer-ing

A. A. Smith, Site QA Coordinator

bec w/ encl:

NRC Resident Insoector

Document Management Branch

State of South Carolina

RII g

RI{'

RI

RII ,

(DMontgomery:ht

JPhtohr

VBr,pwnlee

PK

ogg

'

9////81

9/}g/81

9/g%/81

9/

81