Forwards IE Insp Repts 50-321/81-22 & 50-366/81-22 on 810728-0820.No Noncompliance Noted
ML20031E753
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/16/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20031E754 List:
References
NUDOCS 8110160387
Download: ML20031E753 (2)


See also: IR 05000321/1981022

Text

'

f'

'

a

%

SEP 161981

o [g

C

'K

Georgia Power Company

Q-

ATTN:

Mr. J

H. Miller, Jr.

Executive Vice President

--

OCT 151981-

270 Peachtr ee Street

M u.s. =w **

""

Atlanta, GA 30303

$

h ry

I

Gentlemen:

/

\\f

Subject:

Report Nos. @21/81-223riti 50-366/81-22

This refers to the routine safety inspection conducted by f1r. R. F. Rogers of

this office on July 28 - August 20, 1981, of activities authorized by NRC

Operating License Nos. DPR-57 and NPF-5 for the Hatch facility and to the

discussion of our findings held with Mr. ft. fianry, Plant Manager, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters.

These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary + hat you:

(a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been delayed such

that less than'seven days are available for your review, please notify this

office promptly)so that a new due date may be established.section 2.790(b (1), such appl

Consistent with

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is claimed that the information should be withheld from public

disclosure. .This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4).

The information

sucht to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

4

Room.

WY

_rih

Okh

_

PDR

ffg)/

-

-

-

-

-

-

b

.

-

..

SEP 161981

Georgia Powes Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

,

Sincerely,

f '

$5

i

R. C. Lewis, Director

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report Nos. 50-321/81-22

and 50-366/81-22

cc w/ enc 1:

J. T. Beckham, Vice President and

General Manager-Nuclear Generation

M. Manry, Plant Manager

d

C. E. .Belflower, Site QA Supervisor

bcc w/ encl:

NRC Resident Inspector

Hugh S. Jordan, Executive Secretary

Document Management Branch

j

State of Georgia

.

I

i

RII

RII

RII'j

-g p

-

qJ

'

RRogers:dt

VBrownlee

RC wis

9/D/81

9/\\(/81

9/g/81

, _ _ . _

- . _ -.

. . . _ . . _ , _ _