ML20031E182

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-373/81-29 & 50-374/81-15 on 810824-26.No Noncompliance Noted
ML20031E182
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 09/30/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20031E183 List:
References
NUDOCS 8110150206
Download: ML20031E182 (2)


See also: IR 05000373/1981029

Text

M

1

.

.

.

.

SEP 3 01981

A

4

_

Docket No. 50-373

8

'

fff

'p

Docket No. 50-374

x

Commonwealth Edison Company

OCTI 41984 C

M!

ATTN:

Mr. Cordell Reed

]Sgw.s, %***es%

sam % p/f

Vice President

Post Office Box 767

/

. (/f

Chicago, IL 60690

g

4

-

Gentlemen:

This refers to the routine safety inspection conducted by Mr. I. T. Yin of

this office on August 24-25, 1981, at the site, and on August 26, 1981, at

Sargent and Lundy Engineers offica. cf activities at LaSalle County Station,

Units 1 and 2, authorized by NRC Construction Permits No. CPPR-99 and

No. CPPR-100 and to the discussion of our findings with Mr. B. B. Stephenson

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC rt.quirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

thia letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone vi.hin seven (7)

days from tha date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons which are the bases for the claim that the

infermatice should be withheld from public disclosure. This section further

f

4

a

hI

(

  1. 8110150206 810930

PDR ADOCK 05000373

G

PDR

-

- - -

.

-

.

f

.

.

ISEP 3 o ggl

.

Commonwealth Edison Company

-2-

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). . The information sought to be withheld shall be incor-

porated as far as possible into a separate part of the affidavit.

If we do

not hear from you in this regard within the specified periods noted above, a

copy of this letter and the enclosed inspection report will be placed in the

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

8'Orfgfnaf STgned by c.r. Moref f us

C. E. Norelius, Director

Division of Engineering and

Technical Inspection

Enclosure:

IE Inspection

Reports No. 50-373/81-29

and No. 50-374/81-15

cc w/ encl:

Louis 0. DelGeorge

Director of Nuclear

Licensing

L. J. Burke, Site

Construction Superintendent

T. E. Quaka, Quality

Assurance Supervisor

R. H. Holyoak, St.ation

Superintendent

B. B. Stephenson

Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Mary Jo Murray, Office of

Assistant Attorney General

i

RIIIk,

R3I} d

RIII

RIIIJn#/

RIbId7

uz

At

Yin / sot

Danielson

Reimann

Williams

N4ff#11dgg

9/11/8

g/r[

4-M-d -

qld

-

-