ML20031D811
| ML20031D811 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/08/1981 |
| From: | Crutchfield D Office of Nuclear Reactor Regulation |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20031D812 | List: |
| References | |
| TASK-06-10.A, TASK-6-10.A, TASK-RR LSO5-81-10-014, LSO5-81-10-14, NUDOCS 8110140240 | |
| Download: ML20031D811 (2) | |
Text
q a.
October 08, 1981
(
d Docket No. 50-245
,d k, k
'b LS05 10-014 v
B C
I 5 o c n 3 5 8 7 "y 1, #p#yg 5
Mr. W. G. Counsil. Vice President Nuclear Engineering and Operations Northeast Nuclear Energy Company
%O<
Post Office Box 270 Hartford, Connecticut 06101 Y...
Dear Mr. Counsil:
SUBJECT:
SEP TOPIC VI-10. A. TESTING OF REACTOR TRIP SYSTEM AND ENGINEERED SAFETY FEATURES, INCLUDING RESPONSE TIME TESTING, SAFETY EVALUATION FOR MILLSTONE 1 is our contractor's technical evaluation for this topic. Our contractor's report has been modified to reflect the coments provided in your August 4,1981 letter. is the staff safety evaluation that is bat,ed upon Enclosure 1. proposes modifications to the Technical Specifications to implement a response time testing program and to increase some test feequencies.
The need to actually implement these changes will be determined during the integrated safety assessment. This topic assessment may be revised in the future if your facility design is changed or if HRC criteria relating to this topic are modified before the integrated assessment is completed.
Sincerely, 1
f unis M. Crutchfield, Chief f aerating Reactors Branch No. 5 Jivision of Licensing j
Enclosures:
j N
As statea hs4 ue D7]
cc w/ enclosures:
ADDI See next page 73, p;gg,s do 8110140240 811008 PDR ADOCK 05000245
-D PDR a M, y
.S 2.PB:DL cA ~SNB:DL ORB #5:DL:P ORB,,).
$A:DL i
omer>
.....p..
p,,,u,g,,,,,,,e,1,d, G,,,,,n a,,,,,,,,,
D s
suaaue >
idk,,RHegann,,,,
,,WR,u s s e,1,,1.,,
,,Q,S,he,a,,,,,},,,
om>
..). /. 281...10/2/81...
..10/.i./81..
10l/.481....[.104.2.81.........l.04QL81.....
nac roav aie nami nacu cm OFFICIAL RECORD COPY usam mi-mu
l Mr. W. G. Counsil cc William H. Cuddy, Esquire Connecticut Energy Agency Day, Berry & Howard ATTN: Assistant Director Counselors at Law Research and Policy One Constitution Plaza Development Hartford, Connecticut 06103 Department of Planning and Energy Policy i
Matural Resources Defense Council 20 Grand Street l
91715th Street, N. W.
Hartford, Connecticut 06106
-Washington, D. C.
20005 l
Northeast Nuclear Energy Company l
ATTN: Superintendent Millstone Plant P. O. Box 128 Waterford, Connecticut 06385 Mr. Richard T. Laudenat Manager, Generation Facilities Licensing Northeast Utilities Service Company.
-P. O. Box 270 Hartford, Ccnnecticut 06101 Resident Inspector c/o 11. S. NRC P. O. Box Drawer KK Niantic, Connecticut 06357 l
Waterford Public Library l
Rope Ferry Road, Route 156 Waterford, Connecticut 06385 First Selectman of the Town of Waterford
~
Hall of Records 200 Boston Post Road Waterford, Connecticut 06385 John 7 Opeka Systems Superintendent Northeast Utilities Service Company P. O. Box 270 Hartford, Connecticut 06101 U. S. Environmental Prr tection Agency Region I Office ATTN: EIS C0ORDINATOR l
JFK Federal Building Boston, Massachusetts 02203 i
_