Forwards Evaluation of WCAP-7709-L,Suppls 5,6 & 7, Electric Hydrogen Recombiner for PWR Containments
ML20031D707
Person / Time
Site: Farley, Allens Creek  Southern Nuclear icon.png
Issue date: 06/22/1978
From: Stolz J
Office of Nuclear Reactor Regulation
To: Anderson T
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML20031D662 List:
References
CIVP-A-048, CIVP-A-48, NUDOCS 8110140037
Download: ML20031D707 (2)


Text

o e

v

^

~

JUN 2 21!D9

~

~-

.. _,. ~.

.f t

N Mr. Thomas M. Anderson, Manager

~

maclear Safety Department Westinghouse Electric Corporatice P. O. Box 355 Pittsburgh, Pennsylvania 15230

Dear Mr. Anderson:

SUBJECT:

EVALUATION OF WCAP-7709L, SUPPLEMENTS 5. 6, AND 7 We have completed our review of Westin use Electric Corporation report

. Supplements 5, 6, and.7 to WCAP-7709L Proprietary) and WCAP-7820 (Non-Proprietary) entitled " Electric Hydrogen Recombiner for PWR Containments".

Our evaluation is enclosed.

As a result of our review, we have concluded, subject to the conditicns in our enclosed evaluation, that the Westinghouse electric hydrogen recombiner is acceptably qualified for the seismic and environmental conditions identified c in Supplements 1 througtr 7 of WCAP-7709L in accordance with the requirements of IEEE 323-1974. Applications using the Westingbouse recombiner must include in their Final Safety Analysis Report infonnation to demonstrate either (1) that accident environmental conditions and plant seismic response spectrum are either within the accepted envelope conditions in WCAP-7709L or (2) that l

. the recombiner is acceptably qualified on some other analytical or experimental basis.-

Accordingly, topical report WCAP-7709L and its Supplements 1 through 7 are acceptable for reference in license applications. Topical report WCAP-7820 and its Supplements 1 through 7 is an acceptable non-proprietary version of WCAP-7709L. When either of these reports is used as a reference, both the

_p;.e3pprietary report and the non-proprietary version mst be referenced.

~

In accordance with established procedures, it is requested that Westinghouse I

g ;; ;3 ssue revised versions of these reports within three. months of receipt of fthis letter to include-this acceptance letter, the enclosed evaluation, and any changes resulting from our. review.

We do not intend to repeat our review of these reports when they appear as references in a particular license application except to a::sure that the material presented in these reports is applicable-to the specific plant involved.

8110140037 811009 PDR ADOCK 05000466 T

pop

m c.

7,

- UN 2 21!DB -

Wesi,inghouse Electric Ccrporation,

Should Nuclear Regulatory Comission criteria or regul tions change.'such -

that our conclusions concerning these reports are invalidated, you will be- :' '

notified and given an opportunity to revise and resutarit your' topical reports, m

s.? -

--..,. c c.- rik-

.c - Y should you so desire.

..2

-c..;

2-

..o..}i.-

,,,'.{'h. C;-y N.2;.; ?

$incetel1%

-- y C. ::.,,;- F.~.'

...?

..;.,. ~:.,:.;

~-

r orignal Sisned by

..( '

~~

^ ~

John F.Stol2-John F.~5tolz, Chief Light Water Reactors Branch No. T Division of Project Managennt cc: br. D. Rawlins

~