ML20031D229

From kanterella
Jump to navigation Jump to search
Forwards Auxiliary Feedwater Pump Performance Test
ML20031D229
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 10/05/1981
From: Parker W
DUKE POWER CO.
To: Adensam E, Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20031D230 List:
References
NUDOCS 8110130166
Download: ML20031D229 (1)


Text

.

DiH(E POWE R COMPANY l'owen 13cimixo n?t SocTu Cut:acu SrurET, CnAHLOTTE, N. C. eaan W e LLI AM O. PAR M ER. J R.

dic t PnEsicr et TE 4, E Pe*O N E: AR E A 704 October 5, 1981 3,3.

0,3

s. t, P,0 3,:, a s Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Cornission Washington, D. C.

20555 Attention:

Ms. E. G. Adensam, Chief Licensing Branch No. 4 Re: McGuire Nuclear Station Docket Nos. 50-369, 50-370

Dear Mr. De.can:

describes the results of a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> test of the turbine driven auxiliary feedwater pump.

This report is submitted as required by license condition 2.C.(II)l. in License No. NPF-9.

The attached description also documents the running time of the motor-driven auxiliary feedwater pumps.

If there are any questions regarding this information, please advise.

Verf truly yours,/ _

/

x

%a th. Ia J

'-', William O. Parker, Jr.

GAC/smh Attachment cc:

M. J. Graham Mr. James P. O'Reilly, Director Resident Inspector U. S. Nuclear Regulatory Commission McGuire Nuclear Station Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 pfl 9110130166 811005 i [g1 PDR ADOCK 05000369 P

PDR

..