p tec UNITED STATES p g Cg
,,(
NUCLEAR REGULATORY COMMISSION g
y g
ADVISORY COMMITTEE ON REACTOR SAFEGUARDS g
- y WACHINGTON. D t'. *0;bo 3
%,.... '#g 17,1981 ']N/q m
August l.
Gh %
e (Q
? 4 cyQ Q 9,
2 A o@Iy[i~)
"g Honorable Nunzio J. Palladino 4,\\
/
Chairman b~
f/
U. S. Nuclear Regulatory Commission
'"'},
W Washington, D. C. 20555
SUBJECT:
TWO-HUNDRED-FIFTY-SIXTH MEETING 0F THE ADVISORY COMMITTEE ON REACTOR SAFEGUARDS, AUGUST 6-8, 1981
Dear Dr. Palladino:
The Advisory Committee on Reactor S: ' 'uards held its 256th meeting in Washington, DC on August 6-8, 1981, ems considered at this meeting are summarized below:
256th ACRS Meeting The Committee completed its review of the requests for operation of the Enrico Fermi Atomic Power Plant Unit 2, and the Susquehanna Steam Electric Station Units 1 and 2.
The Committee completed an interim review of the request for op;,otion of the Waterford Steam Electric Station Unit 3.
The Committee approved a memorandum to the Director, Office of Nuclear Reactor Regulation, urging that attention be given to potential seismic-induced and other interactions between nonsafety and safety systems.
Copies of the correspondence noted above have been provided to you.
The Committee met with representathei of the NRC Staff to discuss environmental i
and seismic qualification of electrical equipment (10 CFR Part 50.49).
The Committee met with you and Commissioner Bradford and discussed the question of thermal shock to a reactor pressure vessel from an over-cooling transient, instrumentation for detection of inadequate core cooling, the need for criteria to determine the adequacy of staffing in nuclear power plants, Committee recom-mendations regarding termination of the LOFT Project, and clarification of the Commission's request that the Committee review the recommendations of the Contract Review Panel regarding the program for development of containers for disposal of high-level radioactive wastes.
8110000511 010817 PDR ACRS PDR SL-0265
Honorable Nunzio J. Palladino August 17, 1981 ACRS Subcommittee Activity Since the last report of ACRS activities, the following subcommittee meetings have been held:
Advanced Reactors, in Chicago, IL on July 14-15, 1981 Electrical Systems in Washington, DC on July 22, 1981 Susquehanna Steam Electric Station Units 1 and 2, in Washington, DC on July 23, 1981 Enrico Fermi Atomic Power Plant Unit 2, in Was;.ington, DC on July 24, 1981 Reliability and Probabilistic Assessment, in Los Angeles, CA on July 28-29,1981 Waterford Steam Electric S~.o; ten Unit 3, in Washington, DC on August 5, 1981 Future Schedql_e The following items are tentatively scheduled for consideration durt f the 257th ACRS Meeting, September 10-12, 1981:
Reactor Pressure Vessel Thermal Shock from Overcouling Transients --
briefing by NRC Staff ACRS comments Rulemaking on Reactor Siting Crite.
e.
Rulemaking on Low-Level-Waste Management -- ACRS comments l
Rulemaking on Geological Criteria for Radioactive Waste Disposal -- ACRS l
comments Control of combustible gases resulting from serious reactor accidents --
j briefing regarding current status l
Nuclear Reactor Safety Research and Development Act of 1980 (PL-96-567) --
proposed DOE Plan for Implementation - ACRS comments Task Action Plan A-45, Decay Heat Removal Systems -- ACRS comments Clinch River Breeder Reactor /FY-1982 Reactor Safety Research Program Budget Supplement -- briefing by NRC S'.7 /f l
Honorable Nunzio J. Palladino August 17, 1981 Use of Rules and Regulations in the licensing process -- briefing by NRC Staff Evaluation of Licensee Event Reports -- ACRS comments on proposed changes in coding and search procedures.
Sincerely,
$%2%
J. I, arson Mark Chairman i