ML20031C580
| ML20031C580 | |
| Person / Time | |
|---|---|
| Site: | Marble Hill |
| Issue date: | 09/22/1981 |
| From: | Spessard R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Shields S PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA |
| Shared Package | |
| ML20031C581 | List: |
| References | |
| NUDOCS 8110070319 | |
| Download: ML20031C580 (2) | |
See also: IR 05000546/1981015
Text
-
_
_
. _ _ _ _
__
_ __.
_. ____ __
_ _ _ _ -
__
_ _ .
_
/.
7-
i
I
.
,
.
'SEP 2 2 1981
'
,
4
Docket No. 50-546
e
Docket-No. 50- 57
%
s
A
-
!
y[/ k[.
'
%
Public Service of Indiana
-
ATTN: Mr. S. W. Shields
l
Senior Vice President
-
0 I
,
-
G Jgg
-
g'c%
CO
Nuclear Division
E M
'
W
Post Office Box 190-
2,
os
p
- .
New Washington,'.IN 47162
6
y
'
Gentlemen:
IM
This refers to the routine safety inspection conducted by Mr. Z. R. Schweibinz
!
of this office on September 2-3,19ftl, of activities at Marble Hill Muc1 car
Generating Station, Units 1 and 2, authorized by NRC Construction Permits
<
No. CPPR-170 and No. CPPR-171 and to the discussion of our findings wit.h-
'
Mr. L. O. Ramsett and others of your staff at the conclusion of the
i
inspection.
1
The enclosed. copy of our inspection report identifies areas examined
1
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
,'
.the course of this inspection.
1
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) riotify this office by telephone within 3even (7)
'
days from the date of this letter cf yo'ur intention to file a request for
,
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such infor-
mation. Section 2.790(b)(1) requires that any such application must be.
3
accompanied by an affidavit executed by the owner of the information whidh
- -
,
,
,
.
8110070319 810922
PDR ADOCK 05000546E
.G.
_
__ fDR)
.
g3
y
. .
.
. .
.
t
i
/
)
o
Public Service of Indiana
-2-
identifies the document or part sought to be withheld, and which contains
a full statement of the reasons which are the bases for the claim that the
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
we do not hear from you in this regard within the specified periods noted
above, a copy of this letter and the enclosed inspection' report will be
placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
R. L. Spessard, Director
Division of Resident and
Project Inspection
Enclosure:
IE Inspection
Reports No. 50-546/81-15
-
and No. 50-547/81-15
cc ic/ encl:
W. M Pctro, Executive Director
Nuclear Project Management
C. Kammerer, CA
J. H. Sniezek, IE
DM9/ Document Control Desk (RIDS)
Resider.t Inspector, RIII
<
LeBoeuf, Lamb, Leiby & MacRae
Dava Martin, Office of
Attorney General
John R. Galloway, Staff Director,
Environment, Energy and Natural
Resources Subcommittee
E. P. Martin, Wabash Valley
Po9er Association
RTII
RIII
RIII
RI
RIII
RIII
Y -at-
Schweibinzfj\\ Uf
Oh Y
%S
W yr
hhr
Spessard
p Hawkins
Williams
ittle
9/18/81
ihdt)
glwl91
{f
95,
-
--- -
-
--
-
-
- -
-
-- -
-
-
-
-
- -